Install security cameras at the Richfield municipal wells
Drill new well. Seal existing well.
Well construction
Use landscape boulders to provide a protective barrier to the well.
Public Outreach with tanks. Public Outreach with wells. Public Outreach with ISTS.
Seal 5-10 wells.
Hire engineer/consultant for a new well.
Provide educational materials about wells in Story Map. Provide educational materials to residents about potential contaminants. Utilize local organizationresources to improve public education to residents.
Prep work for installing back-up generator including pad, electrical wiring, and transfer switch.
Full replacement of security system infrastructure (cameras, switches, transmitters, connectivity, software)
Convert emergency power generator to a natural gas generator and have gas main extended approx. 300' to connect to the generator.
Seal unused wells.
Place at least three 1 1/2 - 2 ft. diameter boulders as protective barriers around each of 2 wellheads.
Purchase and install generator (Phase 2)
Seal three 4 inch diameter wells in DWSMA; Seal one 6 inch diameter well in the DWSMA (216322)
Educational groundwater/wellhead exhibit
Educational exhibit; evaluate septic system; sorbent material for hazardous spills
Abandon 2 domestic water wells
Public education ; Tank survey
Install security cameras for the surveillance of wells #5 and #6 at the Water Treatment Plant #1 location
Purchase and installation of a CarboLyser UV raw water monitor at the Mankato treatment plant
Update contaminant source inventory; public education
Verify contaminant source locations; update website
Stream bank restoration
Educational exhibit; backflow preventers; spill kit
Phase 2 Whitaker Project: slope protection at Whitaker Pond
Educational groundwater/wellhead exhibit; build barrier to protect wellhead