The Greater Blue Earth River Basin Alliance (GBERBA) is a joint powers organization consisting of ten member Counties and SWCDs encompassing the Blue Earth, Le Sueur and Watonwan Watersheds. Our mission is to lead in the implementation and promotion of economically viable watershed activities through the combined efforts of local partners. We have identified two target areas in the GBERB (Greater Blue Earth River Basin) where high levels of nitrates directly affect public water supply.
This project will study the geologic controls on nitrate transport in southeast Minnesota's karst landscape and will also provide datasets for other projects over time.
The German-Jefferson Subordinate Service District Board (board) completed a voluntary septic inventory through the Clean Water Fund in 2013. 344 out of 754 parcels participated in the inventory. Approximately 50% of the septic systems were found to be non-compliant with MN Rules Chapter 7080. That project included an assessment of septic systems on non-participating properties that identified eleven priority areas in populated communities with small lots. Three community feasibility studies out of the eleven priority areas were conducted.
The GVCC Pond Excavation Project will remove approximately 2,500 cubic yards of accumulated polycyclic aromatic hydrocarbons (PAH) Level/Tier 3 contaminated sediment from the Golden Valley Country Club stormwater treatment pond.
Gorman Lake has elevated nutrient levels and drains into the Cannon River. This project will provide a subgrant to the Gorman Lake Association to install a two-tiered retention pond to reduce both phosphorus and peak flow from a drainage ditch from reaching Gorman Lake. Project partners include three agricultural producers, the Le Sueur Soil and Water Conservation District and the Natural Resources Conservation Service.
The drainage areas for the Root and Whitewater rivers are located in the karst region of southeastern Minnesota. Karst is defined as a landscape with depressions such as sinkholes caused by underground erosion that dissolves the limestone bedrock making this region home to one of the largest collections of freshwater springs in the United States and some of the best trout fishing in the Midwest.
The project will estimate sand-sized sediment loads for the Blue Earth and Le Sueur Rivers using United States Geological Survey (USGS) measurements to create an overall sediment budget for the rivers in conjunction with already completed fine sediment budgets. The development of the estimates from USGS data and comparisons will strengthen the understanding of the magnitude of the sand component of the total sediment load in the rivers.
The purpose of this project is to develop a framework to implement best management practices (BMPs) on ditches in headwater areas utilizing a partnership between drainage staff and the Greater Blue Earth River Basin Alliance (GBERBA). By replacing failing side-inlets with an alternative design, we can make strides towards our water quality and water quantity goals. The alternative inlets serve to prevent sediment and phosphorus from washing downstream and the design can also alleviate peak flows by temporarily storing stormwater.
The project will estimate the amount of sand loading at the mouth of the Blue Earth and Le Sueur Rivers using suspended sediment and bedload data collected by the United States Geologic Survey (USGS) and the analysis results published by the USGS and others. The development of the estimates from USGS data and comparisons to existing estimates will strengthen the understanding of the magnitude of the sand component of the total sediment load in the rivers.
From 2011 to 2013, the full reconstruction of University Avenue in Saint Paul for the Central Corridor Light Rail Transit (CCLRT) presents a unique opportunity to improve the quality of stormwater runoff from the Corridor that will not be seen again. Assistance from the Clean Water funds will augment large investments being made by Capitol Region Watershed District, Saint Paul, Ramsey County, and Metropolitan Council implementing highly visible, green infrastructure practices in this transportation corridor to achieve significant stormwater volume reduction and water quality improvements.
Green Streets for Blue Waters is a collaborative effort to install curb cut raingardens and other stormwater management practices within public right of way and on private lands. The project development was funded by the City of Bloomington and the Lower Minnesota River Watershed District, who worked with Metro Blooms to identify the project area and goals.
This project is a collaboration between Blue Earth and Watonwan County. The two counties will share information, ideas and resources as they complete mining reclamation and wetland management plans to include in their local water management plans and comprehensive land use plans. Master plans for mining reclamation and wetland management will be used as guidance for planning and zoning decisions and implementing water management priorities that will enhance water quality protection and restoration efforts.
Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.
This project will assess 4 lakes and 17 stream sites. The four lakes will be assessed for total phosphorus, chlorophyll-a, and secchi data by the HCWP staff. Staff will monitor East Twin, West Twin, West Solomon, and St. John’s Lakes for total phosphorus, chlorophyll-a, and Secchi disk readings. In order to obtain a sufficient dataset. Ten samples will be collected over 2 years. Water samples at 17 stream locations for chemical analyses, including intensive watershed monitoring sites and “non-target” sites.
The law also included a direct appropriation of $500,000 in FY2010 to Hennepin County for riparian restoration and stream bank stabilization in the county's 10 primary stream systems. The money is funding projects to protect, enhance and help restore the water quality of five streams and downstream receiving waters. Bassett Creek Plymouth Creek Nine Mile Creek Riley Creek Elm Creek
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF. RESPEC will produce a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.
The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process for the Minnesota River–Headwaters and Lac qui Parle watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) reports.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Agricultural drainage is very prevalent practice in Dodge County and there is a need to implement practices to that will better manage flow and pollutant loads that are being contributed to nearby surface waters. This project involves the installation of a woodchip bioreactor on a tile-drained agricultural field, which will feature improvements in design, and monitoring scope, as compared to a previous bioreactor constructed in Dodge County in 2007.
Demand for Engineering services in Northeast Minnesota's nine-county Area III Technical Service Area is exceeding the capacity to deliver the needed services. There are increased requests from Soil and Water Conservation Districts for engineering needed to design and install Best Management Practices in part due to requests related to Clean Water Fund projects. These funds will be used to hire an engineer, which will increase engineering capacity and result in the completion of at least five additional projects per year.
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.