In Dakota County, groundwater supplies more than 90 percent of the drinking water. In order to protect Dakota County's primary drinking water source, this project proposes to support the County well seal grant cost-share program. The project will provide 50 percent cost-share funding to reimburse landowners for the sealing of unused wells. The goal is to permanently seal between 80-100 unused/abandoned wells throughout the county.
This programmatic proposal accelerates the protection and restoration of 1,073 acres of strategic prairie grassland, wetland, and other wildlife habitats as State Wildlife Management Areas (WMA) open to public hunting. Pheasants Forever (PF) will be protecting parcels that build onto or create a corridor between existing protected lands which will be transferred to the MN Department of Natural Resources (MN DNR) to be included as a WMA. All acquisitions will occur within the prairie, prairie/forest transition, and metro planning regions.
This proposal accelerates the protection and restoration of 792 acres of strategic prairie grasslands, associated wetlands and other wildlife habitats as State Wildlife Management Areas (WMA) open to public hunting. Pheasants Forever (PF) will be permanently protecting strategic parcels within the prairie, prairie/forest transition, and metro planning regions. These acquired properties will be restored to the highest quality wildlife habitat feasible and transferred to the MN Department of Natural Resources (MN DNR) to be included into the WMA system.
This project will accelerate production of County Geologic Atlases (part A). This is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
Funding provided through this appropriation enhanced 5,024 acres of wetland habitat. Eight wetland and shallow lake infrastructure projects were competed that enhanced 1,643 acres of wetland. Cattail spraying using a helicopter outfitted with an OHF-purchased spray unit and impacted impacted 1,762 acres. Work by the Region 3 Roving Habitat Crew enhanced 1,619 acres of wetland. Finally, survey and design work was initiated on four projects to prepare for future construction.