Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
Boy and Swift Lakes are connected lakes on the Boy River, the major tributary stream to Leech Lake. In cooperation with funding from the Boy/Swift Lake Association and the Initiative Foundation Healthy Lakes and Rivers program, this project will result in Subsurface Treatment System (SSTS) compliance inspections on up to 290 properties on Boy Lake and 69 on Swift Lake. The project will also result in an SSTS record review and inventory of all properties on the two lakes.
This project is a cooperative effort including Cass Soil and Water Conservation District, the Association of Cass County Lakes (ACCL), and registered Homeowner Associations throughout Cass County. All of Cass Counties 514 lakes and streams eventually drain into the Upper Mississippi Watershed. Sediment and nutrient pollution continue to be a primary concern when addressing water quality protection issues.
The 400-mile stretch of the Mississippi River from its headwaters at Lake Itasca to Morrison County near Little Falls is the focus of this project. Working in cooperation with the eight member counties, this project will develop implementation plans and strategies geared specifically for the Mississippi River and incorporate them into the individual County Comprehensive Local Water Plans. These recommendations will be for specific strategies, often crossing county boundaries for implementation.
This pilot program protected 1,210 acres of wild rice lake shoreland habitat in the Northern Forest Section by securing 14 permanent RIM conservation easements and four fee-title acquisitions, surpassing our goal of 700 acres, and doing so $250,202 under budget.
This project contains several activities that will implement effective, shovel ready conservation practices on multiple water bodies. The goal is to reduce the erosion impacting stream bank stability. Three initiatives will be implemented, including the installation of four shoreland restoration/stabilization projects, completion of two stream bank stabilization projects on the Middle Fork Crow River and a rain barrel program. An education program will provide outreach to lake and city residents throughout the Middle Fork Crow River Watershed.