This work order will provide the Minnesota Pollution Control Agency (MPCA) with assistance in assembling, graphics, geographic information system (GIS) maps, data synthesis, writing, formatting and editing the 5-year nutrient reduction strategy progress report and update and similar updates for the Sediment Reduction Strategy. The Sediment Strategy update also involves incorporation of modeling results and other technical information into the 2015 strategy document.
This project will result in updates to the Minimal Impact Design Standards (MIDS) Calculator, creation of a water quality calculator based on the MIDS Calculator, and recommended updates to the Minnesota Stormwater Manual. The updated MIDS Calculator will be called MIDS Calculator Version 4 and the water quality calculator will be called MPCA Water Quality Calculator Version 1.
The goal of this project is to obtain key information needed to update the Nutrient Reduction Strategy based on watershed approach experiences over the past five years.
Project goal is to develop Total Maximum Daily Loads (TMDLs) and Watershed Restoration and Protection Strategies (WRAPS) that will protect and improve water quality for the Minnesota portion of the Mississippi River–Reno and Upper Iowa River watersheds. This information paired with other tools (e.g. Hydrologic Simulation Program FORTRAN (HSPF) models and best management practice spreadsheets) and will support restoration and protection strategy development and prioritization efforts in the 1W1P area.
The purpose of this project is to gather data specific to developing a site-specific standard for phosphorus for Upper and Lower Red Lakes. These are large shallow lakes that are located in an area where no shallow lake standard exists. Because of these lakes' unique characteristics, it is believed that a site-specific standard is more appropriate than the deep lake standards that currently exist. This project will include additional chemistry and flow monitoring of tributaries to the lakes, as well as outflow of Lower Red Lake to the Red Lake River.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.
This project is part of a larger ‘Keep It Clean’ educational and waste disposal campaign organized by Beltrami Soil and Water Conservation District (SWCD) and involves local resorts, bait shops, and the Upper Red Lake Area Association (Association). The ‘Keep It Clean’ campaign is an attempt to educate ice fishermen that leaving trash and other waste on the lake ice is illegal and provide them with information and legal options for waste disposal, such as dumpsters placed near the ice road entrances.
The goal of this project is to conduct water chemistry monitoring at two subwatershed sites based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads. This loading information, in turn, will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters.
The main outcome of the project will be the development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
The main outcome of the project will be development of a Total Maximum Daily Load (TMDL) study that address total suspended solids/turbidity impairments of the Mississippi River (Swan River to Crow Wing River). Community outreach to communicate the results and strategies for restoration will also take place during this project.
The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.
The goal of phase 1 of this project is primarily to support organizational planning and coordination among project partners, forming and training a civic engagement team, creating a civic engagement strategic plan, holding two watershed kick off meetings and gathering and summarizing available water quality data. The completion of phase 1 will help provide significant momentum towards the completion of the future phases of the Watershed Restoration and Protection Strategy (WRAPS) process.
This project is for the editing the draft Watershed Restoration and Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
The goal of this project is to construct two executable Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the Minnesota River Headwaters and Lac qui Parle watersheds. The contractor will use the Minnesota River HSPF model application already developed by Tetra Tech as a starting point and will refine the model construction based on the details in this work plan. The contractor will produce HSPF models that, after calibration and validation, will readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will provide MPCA staff, local partners and citizen volunteers with a framework for building local capacity to design civic engagement and communication/outreach efforts that will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed.
This goal of this project is the completion of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Upper Red River watershed in the Red River Basin. This includes the construction, calibration, and validation of the model for hydrology and water quality parameters.
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
This project will conduct water chemistry monitoring at two subwatershed sites based on flow conditions and targeting runoff events. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
This project will collect up to one year of water quality and stream flow information on Kelle’s Coulee to aid in the development of the Valley Branch Watershed District Restoration and Protection study. The information being collected by the Washington Conservation District will be used in developing the models necessary to complete the TMDL for Kelle’s Coulee.
Within the Valley Branch Watershed District (VBWD), there 47 Minnesota Department of Natural Resoruces (MN DNR)-protected basins with surface areas larger than 10 acres and three DNR-protected streams. Only Sunfish Lake is currently on MPCA’s 303(d) Impaired Waters List for aquatic recreation due to excessive nutrients. However, Bay Lake, Eagle Point Lake, Downs Lake, Goose Lake, Kramer Pond, and Echo Lake are on the draft 2012 Minnesota 303(d) Impaired Waters List for aquatic recreation due to excessive nutrients, and Kelle’s Coulee is on the draft 2012 list due to bacteria.
2016: Five locations will be monitored in support of the combined Vermilion Community College and Rainy River Community College 2016 – 2017 Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) Sampling Agreement. Water samples, field measurements, field images, and other observations will be obtained at each location during each sampling event.
Five locations will be monitored in support of the combined Vermilion Community College and Rainy River Community College 2014 – 2015 MPCA Watershed Pollutant Load Monitoring Network (WPLMN) Sampling Grant. Water samples, field measurements, field images / pictures, and other measurements and observations will be obtained at each location during each sampling event.
The VRWJPO is pursuing a Watershed Restoration and Protection Strategy (WRAPS) project in cooperation with the MPCA in order to better identify the sources of stress and impairment to the river, tributaries, and lakes and evaluate the feasibility of reaching water quality goals, and properly allocating pollution reduction goals to those areas identified as likely pollution sources. Successful restoration and protection outcomes are dependent on successful community building and ownership of both the problems and solutions identified in the WRAPS.
Eight locations will be monitored in support of the Vermilion Community College (VCC) Surface Water Assessment Grant (SWAG). Water samples, field measurements, field images / pictures, and other measurements and observations will be obtained at each location during each sampling event.
The goal is to develop the Watershed Restoration and Protection Strategy (WRAPS) and a public and stakeholder participation process that encourages local involvement in water quality discussions and solutions, identifying impaired waters, developing Total Maximum Daily Loads (TMDLs); and planning, setting priorities, and implementing the WRAPS recommendation to restore impaired waters. Phase II of the WRAPS will consists of developing TMDLs for the impaired reaches as well as developing the final WRAPS document and implementation planning.
The purpose of this project is to collect data sets of specific parameters selected by the MPCA while fostering citizen interest and participation in surface water monitoring.
This project will collect data for 8 lakes and 4 stream sites in 2010 and 2011. The lakes included in this project have little or no data, or are lakes where citizens have asked for monitoring assistance.
This project will utilize eight surface water sites in the Redeye River Watershed to collect chemical samples and complete field analysis that will be helpful in determining the health of the streams in the watershed. The Redeye River Watershed contains three main rivers (Red Eye, Leaf, and Wing) that drain to the Crow Wing River and ultimately to the Mississippi River. Main concerns in this watershed are low dissolved oxygen levels, excess sediment, increased drainage and flow alterations, and high bacteria levels.
As part of the Minnesota Pollution Control Agency's (MPCA's) watershed monitoring Approach, the Washington Conservation District will collect water quality samples on three lakes in the Lower St. Croix River Watershed in 2019-20; Comfort Lake, Square Lake, and Big Marine Lake. Rural and agricultural land uses are major components of all three lakes' subwatersheds and semi-urban land use is present in the Comfort lake subwatershed.
This provides a project manager to work with regulated parties to identify new or more efficient ways of meeting standards at wastewater treatment facilities (municipal and industrial).
Implementing the outcomes of our past project to research optimization activities in Minnesota wastewater ponds. This project will employ technical assistance and grant funds to improve nutrient removal and performance.
This project will collect water samples at seventeen monitoring locations ranging in size from 23,173 acres (7 Mile Creek) to over 9 million acres (Minnesota River at St. Peter) as a part of the Watershed Pollutant Load Monitoring Network (WPLMN). The Minnesota State University - Water Resources Center (WRC) has been directly involved with the program and is familiar with the streams and hydrology of the region. In addition to monitoring, the WRC will review, manage and submit the data in formats provided by the Minnesota Pollution Control Agency (MPCA).