All Projects

4 Results for
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin