All Projects

228 Results for
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
East Otter Tail Soil and Water Conservation District (SWCD)
2023 Fiscal Year Funding Amount
$49,980
Fund Source

The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Tetra Tech
2022 Fiscal Year Funding Amount
$17,656
Fund Source

The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Tetra Tech Inc
2021 Fiscal Year Funding Amount
$17,877
Fund Source

The contractor will use the  Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates  total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Roseau Soil and Water Conservation District
2023 Fiscal Year Funding Amount
$23,555
Fund Source

The Lake of the Woods Watershed Assessment will include the waters of Warroad River and Willow River in Roseau County where sites are located in the lower reaches of each surface water system. This assessment focuses on collection of water chemistry and field parameters at four sites.

Roseau
Recipient
Roseau River Watershed District
2015 Fiscal Year Funding Amount
$83,485
Fund Source

Phase 1 of the Roseau River Watershed Restaration and Protection Strategy (WRAPS) project will focus on planning and coordination among project partners, creating a civic engagement strategic plan, holding a watershed kick-off meeting, gathering and summarizing available watershed information and data, and developing a data gap monitoring plan.

Roseau
Recipient
Roseau Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$31,872
Fund Source

The Roseau River Watershed Assessment will include the waters of the Roseau River, Sprague Creek, Hay Creek and Hayes Lake. All of the monitoring sites, except one, are located in Roseau County, with the exception being located in Kittson County. This assessment focuses on collection of water chemistry and field parameters at one site on Hayes Lake and seven key sites on the Roseau River, which have been identified by MPCA. These sites are located in the lower reaches of each surface water system.

Roseau
Recipient
Roseau River Watershed District
2017 Fiscal Year Funding Amount
$99,999
2020 Fiscal Year Funding Amount
$130,000
Fund Source

This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.

Kittson
Roseau
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$99,999
Fund Source

The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.

Beltrami
Kittson
Lake of the Woods
Marshall
Roseau
Recipient
Sand Hill Watershed District
2013 Fiscal Year Funding Amount
$106,249
Fund Source

The goals of the Sand Hill River WRAP will be accomplished in two project phases.

Mahnomen
Norman
Polk
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$9,998
Fund Source

The goal of this project is to update the time series and calibration for the Sandhill River Hydrological Simulation Program – FORTRAN (HSPF) model.

Mahnomen
Norman
Polk
Recipient
Sauk River Watershed District
2019 Fiscal Year Funding Amount
$135,478
2022 Fiscal Year Funding Amount
$128,521
Fund Source

This project will focus on monitoring & assessment, stressor ID assistance, problem investigation, watershed prioritization and targeting, Total Maximum Daily Load (TMDL) report development, Watershed Restoration and Protection Strategy (WRAPS) report updates and continuing civic engagement for the Sauk River Watershed.

Douglas
Meeker
Pope
Stearns
Todd
Recipient
Tetra Tech
2020 Fiscal Year Funding Amount
$14,945
Fund Source

This work order will extend all of the timeseries in the Sauk River Watershed  Hydrological Simulation Program FORTRAN (HSPF) model through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
RESPEC
2021 Fiscal Year Funding Amount
$24,891
Fund Source

The goal of this project is to compile the observed flow and water quality data and update the Sauk River Watershed HSPF model calibration through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2018 Fiscal Year Funding Amount
$54,996
Fund Source

The Sauk River Watershed District (SRWD) shall conduct water quality sampling for the Sauk River and tributary sites, as well as several lakes, for Cycle 2 of the Intensive Watershed Monitoring (IWM) during 2018 and 2019. Field monitoring will be completed at 14 stream locations and 9 lakes designated by the Minnesota Pollution Control Agency.
Data management will also be completed by the SRWD, including entering and submitting all data to Canvas and compiling all photos, calibration logs and other documents as requested.

Stearns
Todd
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$61,540
Fund Source

This project will complete an assessment of watershed lakes and streams. The assessment will include biological and stressor id analysis, which will support a summary report on lake conditions and protection strategies for lakes included in this watershed study.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Minnesota State University- Mankato
2011 Fiscal Year Funding Amount
$34,345
Fund Source

The Seven Mile Creek Condition Monitoring project will maintain and build on the continuous flow and water quality data base at three stream sites and one county tile in the Seven Mile Creek watershed through the collection of approximately eighty five water samples per monitoring season in preparation for the Middle Minnesota Intensive Watershed Monitoring scheduled to begin in 2013.

Blue Earth
Brown
Cottonwood
Le Sueur
Nicollet
Redwood
Renville
Sibley
Watonwan
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$952
Fund Source

This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Crow River Organization of Water
2015 Fiscal Year Funding Amount
$129,999
Fund Source

Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$24,940
Fund Source

This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Minnesota Department of Agriculture
2019 Fiscal Year Funding Amount
$25,000
Fund Source

The purpose of this effort is to create an educational video that will “bring to life” geo-scientific information related to groundwater movement in southeast Minnesota. This video will be used by the Minnesota Pollution Control Agency (MPCA), Minnesota Department of Agriculture (MDA) and other regional partners to help explain the local geology and related groundwater movement. It is anticipated that the video will be used at meetings and other events related to water resource management and natural resource issues. In addition, three stand alone high resolution graphics will be created.

Dakota
Dodge
Fillmore
Goodhue
Houston
Olmsted
Rice
Wabasha
Winona
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2013 Fiscal Year Funding Amount
$109,128
Fund Source

The goal of the project is to sustain the existing Volunteer Nitrate Monitoring Network (VNMN) domestic well network for long-term groundwater quality studies by generating ambient groundwater quality data in domestic drinking water wells completed in various southeastern Minnesota aquifers, contrasting vulnerable and non-vulnerable hydrogeologic settings.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Minnesota Department of Agriculture
2011 Fiscal Year Funding Amount
$58,360
Fund Source

This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Blue Earth County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$6,000
Fund Source

This project will provide additional monitoring data to be utilized in the watershed assessment process for the Le Sueur River Watershed Project. Monitoring will take place for an additional year at two sites along the Maple River.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Greater Blue Earth River Basin Alliance
2011 Fiscal Year Funding Amount
$105,196
Fund Source

This project will identify priority management zones (PMZ), for the purposes of water quality restoration and protection, within the LeSueur River major watershed. This project is only one component of a larger effort in the LeSueur watershed to complete Total Maximum Daily Load (TMDL) studies while engaging citizens and landowners in land management planning.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Le Sueur County
2014 Fiscal Year Funding Amount
$21,859
Fund Source

The Lower Minnesota River Watershed is on schedule for monitoring in 2014 and 2015. The requested sample sites that are listed in the RFP for Le Sueur County are Le Sueur Creek, Forest Prairie, a joint drainage tributary in the NW part of the county and Lake Sanborn. The project goal is to obtain useful water quality data in the Lower Minnesota River Watershed. Project objectives are: 1. Complete project planning by April 15 2014. 2.

Le Sueur
Recipient
International Water Institute
2011 Fiscal Year Funding Amount
$55,198
Fund Source

This project will complete the dataset required for assessment of Aquatic Recreation Use at 8 stream sites and 11 lake sites in the Sand Hill Watershed.

Mahnomen
Norman
Polk
Recipient
Cannon River Watershed Partnership
2010 Fiscal Year Funding Amount
$69,471
Fund Source

This project will assess lakes and streams in the Cannon River watershed that have not been assessed to determine if they are meeting their designated uses. Some of these lakes and streams have data for certain pollutants, but not enough to complete an impairment assessment. The river and stream reaches are located in Dakota, Goodhue, Le Sueur, Rice, Steele, and Waseca counties. The lakes are located throughout the Cannon watershed (Le Sueur, Rice and Waseca Counties). This project will be a continuation of past assessments conducted in 2007 and 2009.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Becker County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$19,176
Fund Source

This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.

Becker
Cass
Clay
Clearwater
Crow Wing
Hubbard
Mahnomen
Morrison
Norman
Otter Tail
Polk
Todd
Wadena
Recipient
Norman County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$50,364
Fund Source

This project will obtain lab and field data for waterbodies within the Wild Rice Watershed, to meet surface water assessment goals. Data will continue to be collected further upstream of some 2008 sites and enhance current assessment datasets. Some new tributaries, that lack assessment data, will also be monitored. The project goal is to complete the datasets necessary for the assessment of Aquatic Recreation Use for twelve streams in the Wild Rice Watershed.

Becker
Clay
Clearwater
Mahnomen
Norman
Polk
Recipient
Roseau Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$38,934
Fund Source

The Lake of the Woods Watershed Assessment will include the waters of Warroad River and Willow Creek in Roseau County and Williams Creek and Bostic Creek in Lake of the Woods (LOW) County. This assessment project will focus on the collection of water chemistry and field parameters at the six key sites identified and modified by MPCA. One site on the Warroad River will have extra nutrient and chlorophyll analysis done. Sites are located in the lower reaches of each surface water system.

Lake of the Woods
Roseau
Recipient
Crow River Organization Of Water (CROW)
2012 Fiscal Year Funding Amount
$191,441
Fund Source

This project will collect additional water quality and flow data on tributaries on the South Fork Crow River and Buffalo Creek. Further assessment of these reaches will provide a better understanding of what impacts these tributaries have on the impaired South Fork Crow River and Buffalo Creek.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Zumbro Watershed Partnership
2012 Fiscal Year Funding Amount
$76,360
Fund Source

The Zumbro River Watershed is a major watershed in the Lower Mississippi River basin in SE Minnesota. It includes parts of six counties, covering 910,291 acres. This project will assess all 13 stream reaches in the Zumbro River Watershed to determine if they are meeting their designated uses. The monitoring will entail collecting water chemistry and field parameters.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Hubbard County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$11,509
Fund Source

This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Douglas Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$16,892
Fund Source

This project will obtain a lake data set for Douglas County while fostering lake association participation, ownership, and understanding of their lakes. A better understanding of these lakes is necessary in order to meet goals established in the 2009-2019 Comprehensive Local Water Management Plan and enable 303(d) and 305(b) assessments. Lakes included in this project are: Agnes, Alvin, Blackwell, Brophy, Charley, Cook (Cork), Crooked (East), Crooked (NW), Echo, Henry, Lovera (Lovers), Mina, Round, and Spring.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Rice County Planning and Zoning
2010 Fiscal Year Funding Amount
$25,308
Fund Source

Rice County Water Resources Division will complete a Surface Water Assessment for six lakes located in the Cannon River Watershed. The lakes chosen include: Sprague Lake (66-0045-00), Mud Lake (66-0054-00), Hatch Lake (66-0063-00), Pooles Lake (66-0046-00), Logue Lake (66-0057-00), and Phelps Lake (66-0062-00). Each lake chosen is currently unassessed, and both Sprague and Mud lake are priority lakes for testing. Sampling will include testing dissolved oxygen, temperature, pH, Secchi, Total phosphorus, and chlorophyll-a. The samples will be taken by volunteers and paid staff.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$43,338
Fund Source

This project will collect water quality data at sites within the Thief River watershed. Nine monitoring sites were chosen at strategic locations along the Thief River and its significant tributaries.

Beltrami
Marshall
Pennington
Roseau
Recipient
Todd County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$38,650
Fund Source

The goal of this project is to decrease nutrient loading in the lake and rivers within the Swan River Watershed. The Local Water Plan currently identifies surface water contamination and declining water clarity as a priority concern of Todd County. Agency members specifically identified the Swan River Watershed as an area of high priority for restoration efforts. Big Swan Lake is specifically mentioned for its roosting site for purple martins and for the unique wildlife resources it makes available in this subwatershed.

Todd