All Projects

2286 Results for
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Minnesota Department of Health
2010 Fiscal Year Funding Amount
$66,248
Fund Source

Naturally occurring arsenic can make groundwater unsafe for drinking. Before going to the expense of drilling a well and sampling the water for arsenic, it would benefit public health to be able to predict the level of arsenic in groundwater in a certain area. A special research project with the U.S. Geological Survey is designed to develop the capacity to assess local geological conditions, related groundwater chemistry and well construction factors in three counties in order to predict the levels of arsenic found in groundwater related to those variables.

Statewide
Recipient
USGS
2011 Fiscal Year Funding Amount
$594,000

PROJECT OVERVIEW

Statewide
Recipient
St. Cloud State University
2010 Fiscal Year Funding Amount
$125,816
Fund Source

This project is a continuation of Statewide Lake study that revealed the obiquitous presence of endrocrine active compounds (EACs) in many MN Lakes. The initial project findings suggested two potential knowledge gaps in our understanding of EACs and their effects in lake environments. First, the sources of EACs and their entrance points into lakes need to be better defined than was possible in our previous statewide lake study.

Statewide
Recipient
Tetra Tech Inc
2024 Fiscal Year Funding Amount
$49,880
Fund Source

Minnesota is currently revising its state-level Nutrient Reduction Strategy (NRS), which was originally completed in 2014. Since 2014, all watersheds in the state have completed Watershed Restoration and Protection Strategies (WRAPS). These technical strategies and reports have been used thus far by over two thirds of watersheds when developing comprehensive local water plans known as “One Watershed, One Plan” (1W1P).

Statewide
Recipient
Minnesota Pollution Control Agency
2018 Fiscal Year Funding Amount
$700,000
Hennepin
Ramsey
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$5,739
2011 Fiscal Year Funding Amount
$148,900
Fund Source

This project will promulgate a nitrate water quality standard to address aquatic life toxicity, and gather information needed to support the development of total nitrogen (N) loading reduction strategies for Minnesota’s waters and also address Minnesota’s contribution to marine water hypoxia. Project will also develop a framework for a watershed nitrogen planning aid that can be used to optimize selection of Best Management Practice (BMP) systems for reducing nitrogen.

Statewide
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
MPCA
2010 Fiscal Year Funding Amount
$300,000

Project Overview

Cook
Lake
St. Louis
Recipient
Emmons and Olivier Resources, Inc
2018 Fiscal Year Funding Amount
$17,448
Fund Source

Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.

Koochiching
Recipient
St. Croix Watershed Research Station
2015 Fiscal Year Funding Amount
$38,795
2017 Fiscal Year Funding Amount
$4,647
Fund Source

The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.

Koochiching
Recipient
Becker Soil and Water Conservation District
2020 Fiscal Year Funding Amount
$10,947

The Becker Soil and Water Conservation District will collect water chemistry and transparency data at Straight, Two Inlets, Hungry Man, Boot, Bass, Big Basswood, Shell, Big Rush and Bass lakes in the Crow Wing River watershed. District staff will collect a complete data set to be used for the Minnesota Pollution Control Agency's efforts to assess the condition of these lakes, and to prioritize restoration and protection activities in the Crow Wing River Watershed Restoration and Protection Strategy (WRAPS) cycle 2 report.

Becker
Recipient
Morris, City of
2014 Fiscal Year Funding Amount
$500,000
Fund Source
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
Stevens
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Sibley County
2010 Fiscal Year Funding Amount
$9,770
Fund Source

This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.

Sibley
Recipient
Itasca SWCD
2020 Fiscal Year Funding Amount
$25,000
Fund Source

This project is for stressor identification data collection in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. This effort will identify and prioritize targeted restoration and protection areas where there are data gaps within the Big Fork River Watershed to maintain and enhance water quality.

Itasca
Recipient
Itasca Soil and Water Conservation District
2022 Fiscal Year Funding Amount
$24,997
Fund Source

The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.

Itasca
Recipient
Koochiching County Soil and Water Conservation District
2022 Fiscal Year Funding Amount
$24,998
Fund Source

The purpose of this contract is to expand data collection efforts, public participation efforts, and provide technical assistance in targeted areas of the Big Fork River Watershed for the Watershed Restoration and Protection Strategy (WRAPS) Project. A key aspect of this effort is to develop implementation strategies for targeted areas of the watershed to help state agencies, local governments, and other watershed stakeholders determine how to best proceed with restoring and protecting the watershed.

Koochiching
Recipient
Aitkin County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$4,851
Fund Source

This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.

Aitkin
Carlton
St. Louis
Recipient
Koochiching County Soil & Water Conservation District
2015 Fiscal Year Funding Amount
$161,596
Fund Source

The goals of this project are to develop and implement a stakeholder and public engagement program, update the Hydrological Simulation Program FORTRAN (HSPF) models for the Big Fork and Little Fork River Watersheds, develop Total Maximum Daily Load (TMDL) studies for impaired waterbodies, remove naturally impaired streams from the impairment list, develop a Watershed Restoration and Protection Strategy (WRAPS) report, and to conduct civic engagement activates necessary to ensure project success.

Koochiching
Recipient
Itasca County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$15,365
Fund Source

"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and

Itasca
Koochiching
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$52,077
Fund Source

The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.

Itasca
Koochiching
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$109,878
Fund Source

The goal of this project is to develop statewide biological criteria for managing the state’s water resources, in keeping with the federal Clean Water Act. The MPCA is using the Biological Condition Gradient (BCG) for this development. The BCG is a conceptual model that describes changes in aquatic ecosystems on a gradient of increasing anthropogenic stress.

Statewide
Recipient
Rhithron Associates
2015 Fiscal Year Funding Amount
$155,860
Fund Source

The purpose of this project is to provide stream and large river macro invertebrate sample processing and identification for the Minnesota Pollution Control agency (MPCA) Biological Monitoring Unit.

The final product will consist of; data submitted electronically to the MPCA, project reference specification, return of all identified specimens, and an external and internal QA/QC report.

Statewide
Recipient
United States Geological Survey
2022 Fiscal Year Funding Amount
$43,178
Fund Source

This project will assess the efficiency of membrane bioreactor treatment to remove contaminants of emerging concern from wastewater, disinfect wastewater, and produce less toxic waste stream to fish. The study will analyze and interpret 40 effluent samples.

Statewide
Recipient
Faribault County SWCD
2019 Fiscal Year Funding Amount
$267,400
Fund Source

The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Minnesota State University - Mankato
2021 Fiscal Year Funding Amount
$49,992
Fund Source

The goal of this project is to develop and write the Watershed Restoration and Protection Strategy (WRAPS) report for the Blue Earth River Watershed to provide restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Blue Earth County SWCD
2018 Fiscal Year Funding Amount
$29,929
Fund Source

The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed.  The stream sites will be monitored at the road crossing locations via bridge, culvert or shore.  Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.  

Blue Earth
Waseca
Recipient
Faribault County
2010 Fiscal Year Funding Amount
$250,000
Fund Source

This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.

Faribault
Recipient
Faribault County SWCD
2017 Fiscal Year Funding Amount
$94,500
Fund Source

The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Blue Earth County Soil and Water Conservation District
2024 Fiscal Year Funding Amount
$26,700
Fund Source

The Blue Earth Soil and Water Conservation District (SWCD) will be monitoring 7 stream sites with 5 located in the Watonwan River Watershed and 2 located in the Minnesota River at Mankato Watershed. The stream sites will be monitored at the road crosssing locations via bridge, culvert or shore. Onsite conditions will be recorded, water sample readings will be taken for secchi tube, specific conductance, temperature, ph, DO, and phtots taken. The Blue Earth SWCD will work with the Minnesota Pollution Control Agency (MPCA) on final reports and results of the water monitoring efforts.

Blue Earth
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Carver
Dakota
Hennepin
Le Sueur
McLeod
Rice
Scott
Sibley
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$14,950
Fund Source

This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.

Grant
Otter Tail
Traverse
Wilkin
Recipient
RESPEC
2023 Fiscal Year Funding Amount
$14,997
Fund Source

The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.

Big Stone
Grant
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$10,381
Fund Source

This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Bois de Sioux Watershed District
2011 Fiscal Year Funding Amount
$150,000
Fund Source

This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Recipient
Brown County
2010 Fiscal Year Funding Amount
$33,065
Fund Source

This project will work in cooperation with individual volunteers to perform grab samples and visual assessments of four waterbody sites in Brown County. The data collected will be an educational tool to inform the County’s citizens about water quality concerns. Using volunteers to collect the water quality samples and visual assessments will result in the volunteers taking personal pride and stewardship in clean water throughout the County.

Brown
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source

The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2. 

Becker
Clay
Otter Tail
Wilkin