All Projects

263 Results for
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$7,469
Fund Source

This project is for technical assistance during the Lake Winona Nutrient Total Maximum Daily Load (TMDL) public notice and revisions to the document prior to sending to the Environmental Protection Agency (EPA) for final approval.

Douglas
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
East Otter Tail Soil and Water Conservation District (SWCD)
2023 Fiscal Year Funding Amount
$49,980
Fund Source

The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Renville County Agricultural Society
2013 Fiscal Year Funding Amount
$7,783

To offer new arts demonstrations at the Renville County Fair. Programming will include a performance by an educational vocal band, and demonstrations by an artist specializing in Chinese calligraphy.

Renville
Recipient
Renville CountyAgricultural Society
2013 Fiscal Year Funding Amount
$10,380

To bring new arts and cultural heritage programming to the Renville County Fair. Programming included a performance by the Red Tree Singers, a Native American group, and Kid Power, an interactive kids’ program. Funds were also used to commission a local artist to paint a mural depicting local agriculture and history.

Renville
Recipient
Hawk Creek Watershed District
2015 Fiscal Year Funding Amount
$306,750
Fund Source

The primary outcome of this project will be to work with five local landowners to implement BMPs that focus on protection of the Renville County portion of the Minnesota River- Mankato Watershed from elevated nutrient levels, in particular phosphorus. This project will utilize outreach and education to incorporate public involvement and input into targeted BMP implementation and the decision making process of watershed issues.

Renville
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Winona State University
2019 Fiscal Year Funding Amount
$22,000
Fund Source

The purpose of this project is to assess the amount of land in the Root River watershed that is treated by structural best management practices (BMPs); more specifically, Water and Sediment Control Basins. The 2016 Root River Watershed Restoration and Protection Strategy (WRAPS) report recommended reducing sediment loss from upland areas and reducing nitrate loading to streams from runoff. Understanding the location and density of these BMPs will is important for targeting future watershed protection and restoration efforts.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Tetra Tech
2022 Fiscal Year Funding Amount
$17,656
Fund Source

The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Tetra Tech Inc
2021 Fiscal Year Funding Amount
$17,877
Fund Source

The contractor will use the  Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates  total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Fillmore County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$319,700
Fund Source

TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$86,582
Fund Source

The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Mille Lacs Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$111,111
Fund Source

The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$280,000
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Anoka Conservation District
2016 Fiscal Year Funding Amount
$75,000
Fund Source

This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Sauk River Watershed District
2016 Fiscal Year Funding Amount
$48,793
Fund Source

The project goal is to conduct water chemistry monitoring at one subwatershed site, one basin site, and one major watershed site in 2016 and 2017 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Stearns
Recipient
Sauk River Watershed District
2019 Fiscal Year Funding Amount
$135,478
2022 Fiscal Year Funding Amount
$128,521
Fund Source

This project will focus on monitoring & assessment, stressor ID assistance, problem investigation, watershed prioritization and targeting, Total Maximum Daily Load (TMDL) report development, Watershed Restoration and Protection Strategy (WRAPS) report updates and continuing civic engagement for the Sauk River Watershed.

Douglas
Meeker
Pope
Stearns
Todd
Recipient
Tetra Tech
2020 Fiscal Year Funding Amount
$14,945
Fund Source

This work order will extend all of the timeseries in the Sauk River Watershed  Hydrological Simulation Program FORTRAN (HSPF) model through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
RESPEC
2021 Fiscal Year Funding Amount
$24,891
Fund Source

The goal of this project is to compile the observed flow and water quality data and update the Sauk River Watershed HSPF model calibration through 2019. The Sauk River Watershed HSPF model simulates hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and chlorophyll a.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2018 Fiscal Year Funding Amount
$54,996
Fund Source

The Sauk River Watershed District (SRWD) shall conduct water quality sampling for the Sauk River and tributary sites, as well as several lakes, for Cycle 2 of the Intensive Watershed Monitoring (IWM) during 2018 and 2019. Field monitoring will be completed at 14 stream locations and 9 lakes designated by the Minnesota Pollution Control Agency.
Data management will also be completed by the SRWD, including entering and submitting all data to Canvas and compiling all photos, calibration logs and other documents as requested.

Stearns
Todd
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$61,540
Fund Source

This project will complete an assessment of watershed lakes and streams. The assessment will include biological and stressor id analysis, which will support a summary report on lake conditions and protection strategies for lakes included in this watershed study.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$41,783
Fund Source
The goal of this project is the development of a phosphorus TMDL for the eleven impaired lakes in the Sauk River Watershed.
Stearns
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$9,980
Fund Source
Develop a phosphorus TMDL for Eden and Vails Lakes in the Sauk River Watershed.
Stearns
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Cass
Chippewa
Chisago
Clearwater
Cottonwood
Crow Wing
Dakota
Douglas
Faribault
Freeborn
Goodhue
Grant
Hennepin
Hubbard
Isanti
Itasca
Recipient
Minnesota State University- Mankato
2011 Fiscal Year Funding Amount
$34,345
Fund Source

The Seven Mile Creek Condition Monitoring project will maintain and build on the continuous flow and water quality data base at three stream sites and one county tile in the Seven Mile Creek watershed through the collection of approximately eighty five water samples per monitoring season in preparation for the Middle Minnesota Intensive Watershed Monitoring scheduled to begin in 2013.

Blue Earth
Brown
Cottonwood
Le Sueur
Nicollet
Redwood
Renville
Sibley
Watonwan
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$952
Fund Source

This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Crow River Organization of Water
2015 Fiscal Year Funding Amount
$129,999
Fund Source

Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$24,940
Fund Source

This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2013 Fiscal Year Funding Amount
$109,128
Fund Source

The goal of the project is to sustain the existing Volunteer Nitrate Monitoring Network (VNMN) domestic well network for long-term groundwater quality studies by generating ambient groundwater quality data in domestic drinking water wells completed in various southeastern Minnesota aquifers, contrasting vulnerable and non-vulnerable hydrogeologic settings.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Fillmore County
2014 Fiscal Year Funding Amount
$56,717
Fund Source

The goal of this project is to investigate nitrate transport and the sources of nitrate in karst for more effective implementation of best management practices that will reduce nitrate concentrations in ground and surface water.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Stearns County Fair Association
2013 Fiscal Year Funding Amount
$7,783

To enhance art access by improving the sound system on the fair’s “Heritage Stage.”

Stearns
Recipient
Le Sueur County Fair Association
2012 Fiscal Year Funding Amount
$7,368

To host a children's show about life on the farm through songs and stories, and offer a presentation about, and create a display area of, antique horse drawn machinery used by farmers from the Le Sueur County area.

Le Sueur
Recipient
Le Sueur County Fair Association
2013 Fiscal Year Funding Amount
$7,783

To educate fairgoers about the early history of the area. The Le Sueur County Fair will create an exhibit on the Native American and early settlers life in the area. The exhibit will include a large tipi, fire pit, artifacts, tools, hides, and more. Funds will also be used to host demonstrations on native and log cabin construction techniques, and drawing and painting activities for children.

Le Sueur
Recipient
Minnesota Department of Agriculture
2011 Fiscal Year Funding Amount
$58,360
Fund Source

This project will complete a Acetochlor Impairment Response Report. This report will combine and coordinate information relating to actions being done in direct response to the acetochlor water quality impairments with those being done and support MDA’s on-going responsibility to assure pesticides are used in a manner that does not cause unreasonable adverse effects on the environment.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Blue Earth County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$6,000
Fund Source

This project will provide additional monitoring data to be utilized in the watershed assessment process for the Le Sueur River Watershed Project. Monitoring will take place for an additional year at two sites along the Maple River.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Greater Blue Earth River Basin Alliance
2011 Fiscal Year Funding Amount
$105,196
Fund Source

This project will identify priority management zones (PMZ), for the purposes of water quality restoration and protection, within the LeSueur River major watershed. This project is only one component of a larger effort in the LeSueur watershed to complete Total Maximum Daily Load (TMDL) studies while engaging citizens and landowners in land management planning.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
Le Sueur County
2014 Fiscal Year Funding Amount
$21,859
Fund Source

The Lower Minnesota River Watershed is on schedule for monitoring in 2014 and 2015. The requested sample sites that are listed in the RFP for Le Sueur County are Le Sueur Creek, Forest Prairie, a joint drainage tributary in the NW part of the county and Lake Sanborn. The project goal is to obtain useful water quality data in the Lower Minnesota River Watershed. Project objectives are: 1. Complete project planning by April 15 2014. 2.

Le Sueur
Recipient
Cannon River Watershed Partnership
2010 Fiscal Year Funding Amount
$69,471
Fund Source

This project will assess lakes and streams in the Cannon River watershed that have not been assessed to determine if they are meeting their designated uses. Some of these lakes and streams have data for certain pollutants, but not enough to complete an impairment assessment. The river and stream reaches are located in Dakota, Goodhue, Le Sueur, Rice, Steele, and Waseca counties. The lakes are located throughout the Cannon watershed (Le Sueur, Rice and Waseca Counties). This project will be a continuation of past assessments conducted in 2007 and 2009.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Becker County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$19,176
Fund Source

This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.

Becker
Cass
Clay
Clearwater
Crow Wing
Hubbard
Mahnomen
Morrison
Norman
Otter Tail
Polk
Todd
Wadena
Recipient
Yellow Medicine River Watershed District
2010 Fiscal Year Funding Amount
$26,995
Fund Source

This project will allow monitoring to take place on nine stream sites and characterize their water quality and determine their impaired status for biological and chemical parameters. The physical and chemical measurements will include dissolved oxygen, pH, temperature, conductivity, transparency, total phosphorus, total Kjeldahl nitrogen, total suspended solids, total volatile solids, nitrite-nitrate nitrogen, chloride, sulfate, hardness and e-coli.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine