The purpose of this program is to engage community groups for the installation of community accessible rain gardens and other water quality best management practices in Ramsey County. The goal is to install 6-12 storm water best management projects that will help protect and improve water quality of surrounding lakes. The installed practices will reduce an estimated 10 acre-feet of storm water runoff, 9 pounds of phosphorous, and 3 tons of sediment annually. Significant measurable outputs, with development of long-term partnerships, are primary objectives for this program.
Ramsey County SWCD is applying to continue the implementation of its popular and successful well sealing cost-share program to help protect the groundwater, especially in highly vulnerable drinking water supply management areas, by permanently and professionally sealing between 115 and 140 abandoned wells in the county.
This project will improve the water quality of lakes in Ramsey and Washington Counties. This will be accomplished by: 1) installation of filtration basins adjacent to Wakefield Lake to reduce nutrient and sediment pollution, and 2) construction of raingardens on private property that filter stormwater runoff thereby reducing sediment and nutrient pollution to Battle Creek Lake and Kohlman Creek. This project is funded through the Ramsey County and Washington County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will conduct a subwatershed feasibility study to identify and prioritize project locations for retrofit of stormwater best management practices. The project will also include installation of the highest priority stormwater improvement practice to reduce nutrient pollution to Goose Lake. This project is funded through the Anoka County and Ramsey County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The Target North St. Paul Stormwater Retrofit project will target phosphorus removal from stormwater runoff. This runoff receives limited treatment before discharging to Kohlman Creek, a waterbody impaired for excess nutrients. This project is one of many efforts RWMWD has undertaken to improve the water quality of Kohlman Lake and the downstream waterbodies. The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary.
Installation of approximately 25 curb-cut rain gardens in priority subwatersheds. Ramsey County Soil and Water Conservation Division has completed 90% designs and are incorporating final design modifications based on comments from our partner Cities (St. Paul and Roseville). Three rain gardens are proposed in the McCarrons subwatershed and 23 are proposed in the Como Lake subwatershed.
Rice Creek WD proposes completion of three projects during this WBIF cycle: 1) Clearwater Creek Stabilization Scoping: The portion of the Main Trunk of Anoka Washington Judicial Ditch 3 (AWJD3, also known as Clearwater Creek) downstream of I-35E has a steep grade with heavily scoured and sloughing banks due to high peak flows and channel velocities and unstable sandy soils.
Implementation of Vadnais Lake Area WMO (VLAWMO)'s existing Landscape Level 2 Grant Program to install at least 1 BMP project between 2023-2025 to make progress on water quality impairments within four priority subwatersheds: Lambert Creek, Goose, Birch, and Gilfillan-Tamarack-Black-Wilkinson-Amelia. Eligible BMPs include project types identified in the Board-approved Landscape Level 2 Grant Policy. The anticipated outcome is a reduction in phosphorus by at least 0.3 pounds annually. This activity will also result in strengthened partnerships with Vadnais Lake Area WPA communities.
Installation of approximately 8 curb-cut rain gardens in St. Paul right-of-way to reduce phosphorus loads by approximately 1.2 pounds annually. Adjacent property owners will be engaged throughout the process and will be responsible for long-term maintenance. Ramsey County Soil and Water Conservation Division will be completing designs which will be approved by City of St. Paul. Approximately six of these gardens will be installed in high priority areas as defined in CRWD's 2021-2030 Watershed Management Plan.
The Lower St. Croix (LSC) Partnership will implement projects and practices in order to achieve a cumulative phosphorus reduction of 381 lb/yr to priority waterbodies identified in Table 5-2 and Table 5-3 of the LSC Comprehensive Watershed Management Plan (CWMP). It will also implement practices in order to protect groundwater, particularly in areas identified in CWMP Figure 5-1 Vulnerable Groundwater in Agricultural Areas. Projects and practices will include structural agricultural BMPs, structural urban BMPs, non-structural ag and urban BMPs, and wetland restorations.
At 410 acres, Lake Owasso is the largest lake in the Grass Lake Water Management Organization (GLWMO) and one of the most pristine. Maintaining the lakes water quality is a priority for the GLWMO. A long urbanized area along Aladdin Street in Roseville currently lacks stormwater features to remove pollutants and reduce water volume. The rainwater from this area drains directly to a wetland which is hydrologically connected to Lake Owasso. Adjacent to the residential area is a 0.5 acre parking lot which drains into a ditch which eventually enters the same wetland.
A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).
A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.
Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.
Lambert Creek discharges into Vadnais Lake, the final impoundment reservoir containing the potable water supply for the city of St. Paul and eight nearby suburbs. Monitoring data indicates high nutrient levels and the creek is listed by the State as having high bacterial levels. In-stream work along Lambert Creek has been maximized with restoration improvements achieving nutrient load reduction. The next step to further improve water quality is to concentrate on restoration efforts on a subwatershed level.