A new GIS technician will help prioritize and target conservation activities and protection strategies in nine north-central Minnesota counties. The GIS technician will create GIS products, assessments, and watershed analysis to identify the high priority areas in each County or watershed in need of protection or restoration using all available data, including LiDAR, soils, land use, completed WRAPS and other datasets. These areas will then be targeted for future resource management efforts, Clean Water Fund projects, and additional conservation activities.
The Sauk River watershed was selected to participate in the federal Mississippi River Basin Initiative (MRBI) program in 2010 to decrease nutrient contributions to the Mississippi River and the Gulf of Mexico. The MRBI program provides federal cost share funds to landowners to install conservation practices.
The Medicine Lake Excess Nutrient Total Maximum Daily Load study indicates a volume reduction of 10% will reduce phosphorus loading to Medicine Lake by over 300 pounds. The 400 Project is a grant program supporting projects to reduce existing impervious surface and increase infiltration through the implementation and use of porous pavement(s) and/or reinforced turf technology. While new construction has more opportunity to include water quality improvements, The 400 Project is unique in that can assist with redevelopment projects where space is limited.
Fourteen permanent RIM Easements on 766 acres of high quality, riparian and forested habitat have been recorded and will provide lasting wildlife habitat. Attempts were made to acquire three tracts in fee title that would have relied on this funding. The owner of one tract rejected an offer of the certified appraised value. Acquisition attempts on the other two tracts were discontinued when it became apparent that the planned use of the land as DNR Wildlife Management Area would be incompatible with local government plans for future municipal growth.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
Crow Wing County is pursuing this grant to continue this proven community and landowner outreach campaign by developing new water planning tools and using print and social media strategies to effect a positive change in our watersheds. The County believes that landowners want to do the right thing and has the data to show that when doing the right thing can be presented in customer-focused, fact-driven, easy-to-understand format, they get engaged and conservation gets done!
The Big Sandy Area Lakes Watershed Management Project has developed innovative projects to protect and improve water quality, wildlife, and the fishery resources in the Big Sandy Lake Watershed since 1991. Projects have focused on the main ecological problems and sources of nutrient loading to Big Sandy and other watershed lakes. A Clean Water Fund Grant provided funding for nine demonstration projects that continue this work. Projects planned for this area focus on controlling shoreline erosion and overland runoff that carries soil and nutrients to the lakes.
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.
The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.
Whaletail Lake (MDNR 27-018400) is located within the jurisdictional boundaries of Pioneer-Sarah Creek Watershed Management Commission (PSCWMC). The lake is considered having two distinct basins relative to the Minnesota water quality nutrient standards with the South basin (MDNR 27-018402) classified as a deep lake (156 acres; max depth 23 feet; & 66% littoral) and the North basin (MDNR 27-0180401) classified as a shallow lake (370 acres; max depth 10 feet; & 100% littoral).
This Phase 5 continuation of the Wild Rice Shoreland Protection Program will utilize permanent conservation easements to protect 500 acres, translating to approximately 3 miles of wild rice shoreland habitat. Sites are selected through an integrative ranking process that considers development risk, surrounding land use, habitat value, and numerous other criteria. BWSR will utilize the RIM Easement process in partnership with 12 local SWCDs within the Northern Forest and Forest/Prairie Transition Sections during the appropriation term.
Twenty six easements protecting 1,173.3 were recorded which exceeded the original proposal by 173 acres (15%). 11.6 miles of shoreline were protected which exceeded the 8 acre goal by 30%. Total expenditure was $1,355,000 which was 17% lower than originally budgeted. No fee-title land acquisition opportunities on wild rice lakes that fit within DNR and other government agency land plans were available during this time period thus DU did not expend any of the $100,000 budgeted for fee-title acquisition. Instead the program focused on RIM easements.
The Bird’s Eye Lake AMA acquisition has been completed. A portion of the land cost had come from this
appropriation, the 2016 Aquatic Habitat OHF appropriation, and by gifts matched with RIM Critical Habitat. This
tract consists of 52 acres, of which 5 acres are being reported on under this appropriation, as to not double count
acreage.
Wirth Lake is located in Theodore Wirth Regional Park in the City of Golden Valley. The lake was listed as Impaired due to excessive phosphorus levels. In recent years water quality goals were met except during instances where seasonal overflows from Bassett Creek into Wirth Lake occurred.With one relatively simple project, the Bassett Creek Watershed Management Commission anticipates that the excess phosphorus problem will be resolved once and for all.