The project is part of the Six Mile-Halsted Bay Subwatershed Plan, a planning partnership currently underway which aims to protect and improve natural resources within this priority subwatershed by working closely with partnering agencies to integrate capital investments and maximize public return on investment. This project will enhance two existing stormwater ponds to enhance treatment of phosphorus as well as incorporate treatment of the Church Lake outlet, a lake which routinely fails to meet state water quality standards and contributes to the water quality impairment of East Auburn.
The primary goal of this project is to protect public water supplies from contamination from nonpoint-sourced pollution by providing farmers with resources to implement soil health Best Management Practices (BMPs) within a set radius of municipal Drinking Water Supply Management Areas (DWSMAs) for cities within Traverse County. The secondary goal of the project is protection of public surface waters and measurable progress towards reduction of nutrient and sediment pollution to impaired watercourses.
Imminent Health Threat (IHT) systems are those that are discharging improperly treated human waste onto the ground surface or into surface waters. In addition to the potential water quality impacts, untreated sewage has the potential to introduce bacteria and viruses into the environment. When IHT systems are identified, county or city staff assist the homeowners through the process required to bring their systems into compliance with the septic ordinance.
Successful long-term treatment of sewage depends on a system capable of providing adequate treatment and effective on-going operation and maintenance. Clean Water Fund Subsurface Sewage Treatment System (SSTS) Program Enhancement funds are used by counties to strengthen programs dedicated to SSTS ordinance management and enforcement. These funds are used for a variety of tasks required to successfully implement a local SSTS program including inventories, enforcement, and databases to insure SSTS maintenance reporting programs.
Grants to counties to implement SSTS programs including inventories, enforcement, development of databases, and systems to insure SSTS maintenance and of reporting program results to BWSR and MPCA and base grants.
With the proposed project, the Pomme de Terre River Association will target catchments delivering the highest 25% of sediment from agricultural land and identified priority management zones for storm water runoff (identified in the Watershed Restoration and Protection Strategy). Implementation is estimate to reduce sediment runoff to prioritized water bodies by 14,690 tons per year and phosphorous by 12,270 pounds per year.
Eight RIM Wetlands applications were selected for funding on 1146.2 acres from this appropriation. In addition 19 RIM-WRP easements, totaling 2,239 acres were funded. Thus a total of 3,385 acres were protected and restored to wetland and grassland habitat. All easements have been recorded. Leverage from other sources of funds was a little over $4.5M.
Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.
Portions of the South Branch of the Buffalo River are currently overloaded with sediment. Two primary waterways in the watershed, Deerhorn Creek and the South Branch, are listed as impaired for turbidity. Due to sediment deposition in the channel, the waterways have lost much of their capacity. Historical attempts by landowners and others to restore the capacity of the channel by removing sediment have had limited success due to additional excess sediment being washed into the channel.
Nitrate levels in the water supply for the city of Benson have slowly but steadily been increasing since 2012. This project aims to work with the landowners surrounding the Drinking Water Supply Management Areas (DWSMA's) for Benson and Appleton in Swift County to reduce or eliminate the amount of nitrate entering these water supplies. Proven and effective strategies will be implemented to achieve the goals set forth in this grant.
Planned improvements to the Downtown area will include installation of underground storage, use of a water tower retired from potable service, and a new irrigation system to utilize stormwater runoff in lieu of potable water for irrigation of several green areas.
The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.
The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).
This project makes an additional plant growth chamber available to increase efficiency for the MPCA Wild Rice Standards Study, which is gathering information about the effects of sulfate on the growth of wild rice.
Wolverton Creek is a 25 mile long tributary to the Red River of the North. Its watershed drains approximately 105 square miles located in Wilkin and western Clay Counties. Wolverton Creek is the outlet for numerous ditch systems and natural drainage in the area and is a significant contributor of sediment to the Red River. The City of Moorhead and other downstream communities obtain drinking water from the Red River. Since 85% of Moorhead's drinking water comes from the Red River, high turbidity results in
higher treatment costs for their drinking water system.
This project will allow lake associations and other motivated groups to use their local landowner networks and site specific knowledge to effectively implement best management practices that fit within the greater context of Wright County's Water Management Plan.