All Projects

296 Results for
Recipient
Area 8 - North Central MN SWCDs JPB
2014 Fiscal Year Funding Amount
$250,000
Fund Source

A new GIS technician will help prioritize and target conservation activities and protection strategies in nine north-central Minnesota counties. The GIS technician will create GIS products, assessments, and watershed analysis to identify the high priority areas in each County or watershed in need of protection or restoration using all available data, including LiDAR, soils, land use, completed WRAPS and other datasets. These areas will then be targeted for future resource management efforts, Clean Water Fund projects, and additional conservation activities.

Beltrami
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Koochiching
Lake of the Woods
Wadena
Recipient
BWSR
2013 Fiscal Year Funding Amount
$13,810,000
Fund Source

Eight RIM Wetlands applications were selected for funding on 1146.2 acres from this appropriation. In addition 19 RIM-WRP easements, totaling 2,239 acres were funded. Thus a total of 3,385 acres were protected and restored to wetland and grassland habitat. All easements have been recorded. Leverage from other sources of funds was a little over $4.5M.

Statewide
Recipient
Area 8 - North Central MN SWCDs JPB
2019 Fiscal Year Funding Amount
$150,000
Fund Source

This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.

Beltrami
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Koochiching
Lake of the Woods
Wadena
Recipient
Buffalo-Red River Watershed District
2013 Fiscal Year Funding Amount
$336,860
Fund Source

Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River Watershed
2011 Fiscal Year Funding Amount
$135,363
Fund Source

Portions of the South Branch of the Buffalo River are currently overloaded with sediment. Two primary waterways in the watershed, Deerhorn Creek and the South Branch, are listed as impaired for turbidity. Due to sediment deposition in the channel, the waterways have lost much of their capacity. Historical attempts by landowners and others to restore the capacity of the channel by removing sediment have had limited success due to additional excess sediment being washed into the channel.

Otter Tail
Wilkin
Recipient
Swift SWCD
2023 Fiscal Year Funding Amount
$285,000
Fund Source

Nitrate levels in the water supply for the city of Benson have slowly but steadily been increasing since 2012. This project aims to work with the landowners surrounding the Drinking Water Supply Management Areas (DWSMA's) for Benson and Appleton in Swift County to reduce or eliminate the amount of nitrate entering these water supplies. Proven and effective strategies will be implemented to achieve the goals set forth in this grant.

Swift
Recipient
Waconia, City of
2023 Fiscal Year Funding Amount
$200,000
Fund Source

Planned improvements to the Downtown area will include installation of underground storage, use of a water tower retired from potable service, and a new irrigation system to utilize stormwater runoff in lieu of potable water for irrigation of several green areas.

Carver
2013 Fiscal Year Funding Amount
$333,590
Fund Source

The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.

Becker
Clay
Otter Tail
Wilkin
Recipient
Area 2 - West Central Technical Service Area
2019 Fiscal Year Funding Amount
$285,000
Fund Source

This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.

Benton
Big Stone
Chippewa
Douglas
Kandiyohi
Meeker
Morrison
Pope
Stearns
Stevens
Swift
Todd
Recipient
Area 2 - West Central Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.

Benton
Big Stone
Chippewa
Douglas
Kandiyohi
Meeker
Morrison
Pope
Stearns
Stevens
Swift
Todd
Recipient
Minnesota Board of Water and Soil Resources
2011 Fiscal Year Funding Amount
$2,300,000
Fund Source

This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).

Cottonwood
Grant
Otter Tail
Rock
Recipient
Upper Minnesota River WD
2024 Fiscal Year Funding Amount
$600,000
Fund Source
Big Stone
Recipient
Geneva Scientific
2013 Fiscal Year Funding Amount
$22,850
Fund Source

This project makes an additional plant growth chamber available to increase efficiency for the MPCA Wild Rice Standards Study, which is gathering information about the effects of sulfate on the growth of wild rice.

Statewide
Recipient
BWSR with Ducks Unlimited
2014 Fiscal Year Funding Amount
$1,630,000
Fund Source

Twenty six easements protecting 1,173.3 were recorded which exceeded the original proposal by 173 acres (15%). 11.6 miles of shoreline were protected which exceeded the 8 acre goal by 30%. Total expenditure was $1,355,000 which was 17% lower than originally budgeted. No fee-title land acquisition opportunities on wild rice lakes that fit within DNR and other government agency land plans were available during this time period thus DU did not expend any of the $100,000 budgeted for fee-title acquisition. Instead the program focused on RIM easements. 

Aitkin
Carlton
Cass
Crow Wing
Hubbard
Itasca
St. Louis
Wadena
Recipient
Buffal-Red River Watershed District
2011 Fiscal Year Funding Amount
$253,229
Fund Source

Wolverton Creek is a 25 mile long tributary to the Red River of the North. Its watershed drains approximately 105 square miles located in Wilkin and western Clay Counties. Wolverton Creek is the outlet for numerous ditch systems and natural drainage in the area and is a significant contributor of sediment to the Red River. The City of Moorhead and other downstream communities obtain drinking water from the Red River. Since 85% of Moorhead's drinking water comes from the Red River, high turbidity results in
higher treatment costs for their drinking water system.

Clay
Grant
Otter Tail
Wilkin
Recipient
Wright SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will allow lake associations and other motivated groups to use their local landowner networks and site specific knowledge to effectively implement best management practices that fit within the greater context of Wright County's Water Management Plan.

Wright