Add WHP information on City website; Include WHP strategies and actions in the City newsletter; Move leaf composting site from the 1-year TOT area; Survey and well inventory; Survey shallow disposal wells; Training about BMP in the DWSMA
Seal abandoned, 14 unused public wells; Update GIS well database; Educate students; Water festival; Educate storage tank owners; Develop "Groundwater News" newsletter
Install fencing around municipal well site; Update PCSI; Contact Randolph Township and Dakota County regarding land use permits and zoning; Research to identify site for new municipal well
Seal test well; Coordinate hazardous waste day; Promote proper rates and application of fertilizer; Provide tours of the municipal water treatment plant
The project will realign portions of the creek in its historical channel, restoring its meander pattern and in-stream habitat by using bioengineering techniques. The techniques included root wads and biologs for streambank protection, vegetated reinforced soil stabilization for streambank stabilization, boulder rock vanes for grade control and in-stream flow control, and constructed riffles and pools for in-stream habitat.
The purpose of this project is to reduce phosphorus entering South Heron Lake (SHL), which currently does not meet state standards for this water pollutant. Efforts will be focused on Jackson County Judicial Ditch 3 (JD3), which has been petitioned to the HLWD for improvement. JD3 drains 52 percent of the SHL watershed, highlighting its importance in making meaningful progress towards water pollution reduction. The practices include eleven water and sediment control basins and a 10-acre storage and treatment wetland restoration.
The South Branch Wild Rice Sediment Reduction Project will implement 45 erosion control structures and 40 acres of filter strips to reduce sediment loading to the South Branch of the Wild Rice River in Becker County. Sediment leaving the project area contributes to water quality impairments downstream where Total Suspended Solids (TSS) are affecting aquatic life and aquatic recreation. This project is projected to reduce sediment loads leaving the project area by 26% and reduce TSS in the Lower Wild Rice River by 7%.
The South Fork Crow River Comprehensive Watershed Management Plan (SFCR CMWP) identifies priority concerns, short-term and long-term goals for drainage water management, loss of water storage and altered hydrology, nutrient loading to surface waters, wind and water erosion, and soil health. Through the plan, specific details for structural and management practices are described in the implementation schedule for each of the planning regions and priority areas.