Planned improvements to the Downtown area will include installation of underground storage, use of a water tower retired from potable service, and a new irrigation system to utilize stormwater runoff in lieu of potable water for irrigation of several green areas.
Ramsey County is the smallest, most densely populated county in the state of Minnesota consisting of primarily urbanized land use. Ramsey County's water resources provide the industrial base, drinking water, and recreational opportunities for over one-half million people on a daily basis. The major environmental problems that Ramsey County lakes and streams face can be traced to the effects that urbanized land use has on these natural resources.
Lake of the Woods is a world-class fishery and an important economic driver for Roseau County. The proposed project will investigate and quantify sources of sediment to the lower portion of the Warroad River near its confluence with Lake of the Woods. Sedimentation at the mouth of the Warroad River is a concern for several reasons including fisheries habitat, water quality and the drinking water supply for the city of Warroad.
Lake of the Woods (LOW) is a resource with local, regional, state, and international significance and is the second largest lake in Minnesota. Over the past three decades the Warroad River Harbor in LOW has experienced severe sedimentation problems. The sedimentation has led to frequent dredging to remove excess sediment and protect this vital resource. However, it is unsustainable to continue dredging the harbor without also addressing the sources of upstream sediment within the Warroad River watershed.
Washington County Department of Public Health and Environment seeks to continue a 100% cost share assistance well sealing program. County residents rely on groundwater for 100% of their drinking water. Sealing unused wells has long been a priority for the county, as they are a potential threat to health, safety, and the environment. The presence of several groundwater contamination areas only highlights the need to seal off these unused wells.
Brown's Creek Watershed District, City of Stillwater and Oak Glen Golf Course will work together to harvest and reuse stormwater for golf course irrigation, reducing thermal loading to Brown?s Creek, a designated trout stream listed as impaired due to high thermal and total suspended solids loading, and reduce phosphorous loading to Lake St. Croix, impaired for excess nutrients. The primary goals are to reduce phosphorous loading to Brown?s Creek and the St. Croix River/Lake St Croix by 67-124 pounds per year and thermal loading to Brown?s Creek by 0.4 degrees Celsius.
The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.
The Big Sandy Area Lakes Watershed Management Project has developed innovative projects to protect and improve water quality, wildlife, and the fishery resources in the Big Sandy Lake Watershed since 1991. Projects have focused on the main ecological problems and sources of nutrient loading to Big Sandy and other watershed lakes. A Clean Water Fund Grant provided funding for nine demonstration projects that continue this work. Projects planned for this area focus on controlling shoreline erosion and overland runoff that carries soil and nutrients to the lakes.
This project targets one of Chisago County's few remaining large dairy operations. It is situated on the top of the St. Croix River escarpment and drains over the bluff to the St. Croix River. This project includes installation of several practices in the feedlot area, including critical area planting to help stabilize a gully formed through the feedlot. There are also two other gullies located at the edge of fields or pasture areas that will be stabilized using water and sediment control structures, grade stabilization practices, or diversions.
In 2009, residents from the Stradford Addition and the Avon Area Lakes Association (AALA) contacted the Stearns County SWCD with concerns of direct stormwater entering Middle Spunk Lake. The Stearns County SWCD met with representatives on site to assess the stormwater problems. Many areas of untreated stormwater that directly discharged into Middle Spunk Lake were identified. It was determined that the watershed areas within the Stradford addition should be retrofitted with best management practices capable of conveying and treating stormwater.
This project builds capacity in soil water conservation districts and Mille Lacs Band with BWSR and DNR to accelerate tree planting for water quality and carbon sequestration by private landowners.
As Best Management Practices (BMPs) such as rain gardens and infiltration swales begin to be implemented in Chisago County, most people don't understand what they are and what their purpose is. With the dual goals of treating stormwater runoff and educating the public, the SWCD applied for and received a Clean Water Fund grant to implement several pre-designed BMPs at
This project will construct a stormwater treatment facility to treat runoff from 6,500 acre urban and agricultural drainage area in and around the City of Watkins, MN. The result is an annual phosphorus reduction of 796 pounds to Lake Betsy, the Clearwater River, and the Clearwater River Chain of Lakes.
The Watonwan Watershed Technician will provide highly focused targeting of conservation programs and practices. The technician will enhance current staff capabilities in the Watonwan watershed by collecting landowner contact information from previous studies and GIS methods, produce mass mailings about funding opportunities, and meet one-on-one with landowners to discuss their conservation concerns. The technician will implement 45 projects/practices over a three year period.
The Watonwan Watershed Resource Specialist has been funding with Clean Water funds since 2012. Since that time, the Watonwan Watershed Resource Specialist has been a crucial connector between landowners and natural resource professionals in the Watonwan Watershed. As the technical ability and responsibilities of the WWRS expands, the need and urgency to secure extended funding becomes a priority. This project will fund half of the Watonwan Watershed Research Specialist position through year 2020.
With the completion of LiDAR data in southern Minnesota, it is imperative to use this data as effectively as possible. In order to do so, the Greater Blue Earth River Basin Alliance (GBERBA) will contract with a vendor to complete a Geographic Information System (GIS) terrain analysis in subsheds of the Watonwan River watershed. This inventory will utilize the State of Minnesota LiDAR elevation datasets to create many GIS datasets by spatially analyzing the elevation data.
The Bois De Sioux Watershed District (BdSWD) is partnering with the Wilkin County Soil and Water Conservation District (SWCD), Wilkin County, and landowners to reduce sediment load by 450 tons/year and phosphorus load by 90 lbs/yr to the Bois de Sioux River. This project is estimated to meet 10% of the Bois de Sioux-Mustinka short-term reduction goals for sediment and 28% of the short-term goal for phosphorus reduction in the planning region. Wilkin County Ditch #1 (WCD #1) outlets to the Bois de Sioux River, which is impaired for turbidity, dissolved oxygen, total phosphorus, and e. coli.
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.
The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.
This project will educate and assist landowners to seal unused wells by providing cost-share funds of 50% up to $1,000 per well located in highly vulnerable groundwater areas in 10 southeast Minnesota counties. Groundwater is the primary source of drinking water and due to the karst geology in SE MN groundwater is more vulnerable to contamination.
The Yellow Medicine One Watershed One Plan has identified Protecting and Preserving Groundwater Quality and Quantity as one of the three priorities addressed in the Plan. Seven priority sub-watersheds have been identified as priority areas, as well as two townships that have been identified by the Department of Agriculture to have vulnerable groundwater areas. Our goal is to provide 50% cost share to seal 34 abandoned wells that are located in these priority areas.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Wellhead Protection Conservation Easement program is targeted to protect drinking water through the Reinvest in Minnesota Program (RIM).
A large amount of effort has gone in to identifying phosphorous loading and other nutrient sources in West Washington County. Installing stormwater retrofit projects at local church campuses represents a major opportunity for water quality improvement. In partnership, three watershed organizations will install conservation practices, targeting impervious surfaces on the campuses. This project will provide funding to install raingardens, pervious pavement and rainwater harvesting methods to capture and improve water quality to downstream water resources.
Whaletail Lake (MDNR 27-018400) is located within the jurisdictional boundaries of Pioneer-Sarah Creek Watershed Management Commission (PSCWMC). The lake is considered having two distinct basins relative to the Minnesota water quality nutrient standards with the South basin (MDNR 27-018402) classified as a deep lake (156 acres; max depth 23 feet; & 66% littoral) and the North basin (MDNR 27-0180401) classified as a shallow lake (370 acres; max depth 10 feet; & 100% littoral).
The Whiskey Creek project involves a coordinated and comprehensive approach to watershed management. This project consists of installing conservation practices that reduce sediment loading to Whiskey Creek while also providing flood reduction benefits to downstream landowners.
The Wilkin Soil and Water Conservation District will partner with the Buffalo Red River Watershed District, the Natural Resources Conservation Service, and landowners to install 59 side inlets to stabilize high priority gullies that are contributing sediment to Whiskey Creek. When these 59 gullies are stabilized, sediment loading to Whiskey Creek will be reduced by an estimated 1,006 tons per year and total phosphorus reduced by 794 pounds per year.