Valley Creek Mainstem Restoration Project

Project Details by Fiscal Year
2024 Fiscal Year Funding Amount
$462,000
Fund Source
Clean Water Fund
Recipient
Valley Branch WD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
April 2024
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Details

The Valley Creek Mainstem Restoration Project will continue to protect and improve Valley Creek, a world-class trout stream located in the Valley Branch Watershed District (VBWD). The project, identified and prioritized for restoration by VBWD as part of a watershed-wide assessment of Valley Creek and its watershed, will increase the creek's floodplain connectivity by reshaping 600 feet of the creek's banks and removing approximately 12,100 cubic yards of material. This will reduce the erosiveness of the waterpower and annually prevent 8.5 tons of sediment from eroding and silting over trout spawning sites. The project will establish a 60-footwide floodplain with native vegetation, replacing buckthorn, burdock, reed canary grass, and other invasive species. This will improve nesting habitat for birds, pollinator habitat, and a wildlife corridor. Establishing a deep-rooted vegetated floodplain is imperative to prevent erosion during high water periods and to maintain the health of this important stream and the downstream St. Croix River. Due to incision in creek, the project will raise the streambed by 1 foot with four 3-inch steps to allow for improved fish passage. The project will employ measures the VBWD has successfully implemented, such as cross vanes and single vanes to direct flow away from outer banks and a series of 3-inch steps to allow fish passage and stop downcutting. Root wads will also be installed along the banks for stabilization and to provide scour holes for fish refuge and habitat. Not only will this project protect the treasure of Valley Creek, but it will also protect the downstream nationally protected but nutrient-impaired St. Croix River.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
no
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota 2023, Chapter 40, Article 2, Section 6 (b)
Appropriation Language

(b) $8,500,000 the first year and $8,500,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2024 Fiscal Year Funding Amount
$462,000
Other Funds Leveraged
$0
Direct expenses
$0
Administration costs
$0
Proposed Measurable Outcome(s)

The project is estimated to reduce annual sediment load by 8.5 tons per year and 10 pounds of total phosphorus per year.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Don Pereira, Ed Marchan, John Brach, John Hamerly, Rick Gelbmann
Project Manager
First Name
John
Last Name
Hanson
Organization Name
Valley Branch WD
Street Address
PO Box 838
City
Lake Elmo
State
MN
Zip Code
55042
Phone
952-832-2622
Email
jhanson@barr.com
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767