Sand Hill River Erosion Area, Phase II

Project Details by Fiscal Year
2012 Fiscal Year Funding Amount
$251,680
Fund Source
Clean Water Fund
Recipient
East Polk Soil and Water Conservation District
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2012
End Date
December 2014
Activity Type
Restoration/Enhancement
Counties Affected
Polk
Polk
Project Overview

The Sand Hill watershed is a priority area because of soil loss associated with steep slopes common in the area. Portions of the Sand Hill River have been listed as impaired due to turbidity. Water quality is also a concern for fish habitat in the lower reaches of the Sand Hill River. This project is a continuation of 2011 Clean Water Fund project to implement erosion control/sediment reduction practices in the Upper Sand Hill River Watershed.
In cooperation with the Sand Hill Watershed District, technical assistance is provided and conservation practices such as sediment basins are installed.Sediment basins are earth embankments designed to keep soil on the ground, not in rivers and streams. Sediment basins also act as temporary storage areas for rainwater. Each sediment basin will reduce on average 18 tons of sediment and 21 pounds of phosphorus per year from entering the Sand Hill River.

Competitive Grant Making Body
Board Members and Qualifications

The 20-member BWSR board consists of representatives of local and state government agencies and citizens. Members are appointed by the governor of the state of Minnesota consistent with Minnesota Statutes 103B.101. Board members at the time the grant was made were: County Commissioner Appointees: Quentin Fairbanks; Tom Loveall; Brian Napstad; Soil and Water Conservation District Appointees: Paul Langseth, Louise Smallidge and Bob Burandt; Watershed District or Watershed Management Organization Appointees: Gene Tiedemann, LuAnn Tolliver and Todd Foster; Citizen Appointees: Paul Brutlag ; Gerald Van Amburg; John Meyer; Cities & Townships: Sandy Hooker -Township; Christy Jo Fogarty -Metro City; Keith Mykleseth -Non-Metro City; Agency: Chris Elvrum - Minnesota Department of Health; Rebecca Flood - Pollution Control Agency; Tom Landwehr - Department of Natural Resources; Matt Wohlman - Minnesota Department of Agriculture; Faye Sleeper - Minnesota Extension Service;

Advisory Group Members and Qualifications

Wayne Zellmer -BWSR Grants Coordinator; Matt Drewitz -BWSR South Region Clean Water Specialist; Art Persons -MDH Planning Supervisor Drinking Water Protection; Jeff Hrubes -BWSR North Region Clean Water Specialist; Marcey Westrick -BWSR Metro Clean Water Specialist; Julie Westerlund -DNR Clean Water Coordinator; Robert L. Sip -MDA Environmental Policy Specialist; Anna Kerr -MPCA -Stormwater / TMDL Coordinator; Nick Proulx -DNR Central Region Clean Water Legacy Specialist; Karen Evens - MPCA -Watershed Projects Manager; Joshua Stamper -MDA Research Scientist, Pesticide & Fertilizer Management; Norman R. Mofjeld -MDA Hydrologist P.G. Well Management Section;

Conflict of Interest Disclosed
No
Conflict of Interest Contact

Nicole Clapp

Legal Citation / Subdivision
Minnesota 2011, First Special Session chapter 6, article 2, section 7
Appropriation Language

(a) $13,750,000 the first year and $13,750,000 the second year are for pollution reduction and restoration grants to local government units and joint powers organizations of local government units to protect surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system (SSTS) projects and stream bank, stream channel, and shoreline restoration projects. The projects must be of long-lasting public benefit, include a match, and be consistent with TMDL implementation plans or local water management plans.

2012 Fiscal Year Funding Amount
$251,680
Other Funds Leveraged
$100,000
Direct expenses
$251,680
Administration costs
$10,000
Number of full time equivalents funded
0.36
Proposed Measurable Outcome(s)

Install 25 water and sediment basins - Sand Hill River Proposed Reductions: 400 lbs/year Phosphorus and 450 tons/year Sediment

Measurable Outcome(s)

The East Polk SWCD has assisted in the installation of 114 water and sediment basins within the Sand Hill River Watershed District. These basin projects have saved 1,373 tons per year of Sediment, and 1,500 pounds per year of Phosphorus from entering the Sand Hill River in East Polk County each year.

Source of Additional Funds

The source of additional funds varies from project to project, but generally consists of federal, local and non-public sources.

Project Manager
First Name
Gary A.
Last Name
Lee
Organization Name
East Polk Soil and Water Conservation District
Street Address
P.O. Box 58 Cleveland Ave
City
McIntosh
State
MN
Zip Code
56556
Phone
(218) 563-2777
Email
gary.lee@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767