Red Lake Watershed District Ditch 3 & Ditch 7

Project Details by Fiscal Year
2011 Fiscal Year Funding Amount
$26,456
Fund Source
Clean Water Fund
Recipient
Red Lake County SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2011
End Date
December 2012
Activity Type
Preservation
Restoration/Enhancement
Counties Affected
Red Lake
Red Lake
Project Overview

The Clean Water Fund Project's primary purpose is to reduce soil loss, eliminate sediment deposition in the two Red Lake Watershed District(RLWD) ditch systems, improve water quality, and reduce maintenance costs along these ditch systems. The project will be a team effort between the Red Lake County SWCD, the Red Lake Watershed District, and the landowners located along the ditch systems.
The project will provide adequate drainage to landowners who own cropland along RLWD Ditch # 3 and RLWD Ditch # 7 and reduce soil loss from their cropland. Measured outcomes will be the amount of soil loss that will be saved, the amount of sedimentation reduced, along with the improvement to the ditch system which in turn reduces maintenance costs. The estimated amount of sedimentation that will be reduced along RLWD Ditch # 3 is 800 tons per year. The estimated amount of sedimentation that will be reduced along RLWD Ditch # 7 is 900 tons per year.
The secondary purpose of this project will be the educational component to this project by educating the landowners on the value of their cropland soil and the improvement to water quality by installing these Best Management Practices.

Competitive Grant Making Body
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Nicole Clapp

2011 Fiscal Year Funding Amount
$26,456
Other Funds Leveraged
$16,801
Proposed Measurable Outcome(s)

The estimated amount of sedimentation that will be reduced along RLWD Ditch # 3 is 800 tons per year. The estimated amount of sedimentation that will be reduced along RLWD Ditch # 7 is 900 tons per year.

Measurable Outcome(s)

This project resulted in meeting the sediment reduction goals for RLWD Ditch #3 and Ditch #7, 800 tons per year and 900 tons per year respectively. This was accomplished with the installation of 9 side water inlet structures on the Ditch #3 system and 25 side water inlet structures on the Ditch #7 system.

Project Manager
First Name
Tanya
Last Name
Hanson
Organization Name
Red Lake SWCD
Phone
(218) 253-2593
Email
tanya.hanson@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767