Normandale Lake Restrooms and Maintenance Garage Replacement
Replace restroom building & maintenance garage south of the Chalet Rd. parking lot with new restrooms that meet ADA requirements and new maintenance/trash/recycling building, including demolition of existing structures, retaining walls, soil corrections, associated stormwater management improvements, landscaping, lighting, concrete driveway & sidewalk connections, utilities, furniture, fixtures, equipment, turf restoration, surveys/permits, signage, plus design/engineering/legal & contingencies
Hyland/Bush/Anderson Lakes Park Reserve - Bloomington
Sec. 4 METROPOLITAN COUNCIL $19,819,000 $20,277,000
1. Design and engineering documents completed 2. Reconstructed ADA-compliant restroom building with at least one accessible toilet each, for men and women 3. Reconstructed maintenance garage
New park building with two gender neutral bathrooms and increased maintenance and storage space
Sec. 4 METROPOLITAN COUNCIL $19,819,000 $20,277,000
1. Design and engineering documents completed 2. Reconstructed ADA-compliant restroom building with at least one accessible toilet each, for men and women 3. Reconstructed maintenance garage
New park building with two gender neutral bathrooms and increased maintenance and storage space