Leech Lake River Implementation Phase 2
The Cass County and Hubbard Soil and Water Conservation Districts (SWCD), and Cass and Hubbard Counties will implement the following Leech Lake River Comprehensive Watershed Management Plan Action Items: 1.Complete 25 Forest Stewardship plans for approximately 2,500 acres in high priority watersheds based on Leech Lake River River 1W1P plan. 2.Assessment study of Lake May Creek and the Necktie River for channel restoration and culvert replacement. 3.Install 8 shoreline buffer practices in identified priority watersheds. 4.Cost Share with Landowners to install pasture management practices to better water quality. 5. Cost-Share with both Cass and Hubbard County Highway Departments to upgrade equipment to reduce chloride usage. 6.Replace Big Deep Lake Outlet Culvert and install catchment basins, which is located on the Boy River. 7. Cost share with the City of Walker to install additional Stormwater defender on Cleveland Blvd.
http://www.bwsr.state.mn.us/board
http://www.bwsr.state.mn.us/board
Annie Felix-Gerth
2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.
1. 2,500 additional acres of PFM,
2. Removal of additional 1,250 pounds of sediment.
3. Removal of 8 pounds of Phosphorus and 16 pounds of Nitrogen.
4. 30% reduction in chloride usage for 2 salt trucks in watershed.
LOCAL LEVERAGED FUNDS