2025 Middle-Snake-Tamarac Rivers WBIF
The Middle-Snake-Tamarac Rivers Watershed is divided into four planning regions including the Headwaters, Lower Tamarac,
Lower Middle, and the Snake River regions. In all four regions, concerns for sediment, stream stability, drainage system
instability, groundwater pollution, and excess phosphorus have been identified as either high or medium priority resource
concerns in The Comprehensive Watershed Management Plan (CWMP). Grant activities are estimated to reduce sediment loading by 481 tons/year and phosphorus loading by 301 pounds/year through the implementation of structural agricultural practices and streambank/ditch stabilization projects. An estimated 2,000 feet of streams/priority drainage systems will be stabilized. An estimated 40 Ag BMP Practices and 30 unused wells will be
sealed. This will make progress towards meeting the plan's short-term goals of reducing runoff sediment loading by 11% or
37,300 tons/year, total phosphorus loading by 7% or 24,250 pounds/year, enhancing 20 miles of prioritized stream channels as
well as 27 miles of prioritized drainage systems, and sealing 10 unused wells per year.
Annie Felix-Gerth
(a) $39,500,000 the first year and $39,500,000 the second year are for grants to implement state-approved watershed-based plans. The grants may be used to implement projects or programs that protect, enhance, and restore surface PreviouswaterNext quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking PreviouswaterNext sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan program and seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for: (1) implementing state-approved plans, including within the following watershed planning areas (see Chapter 40 Article 2 Section 6(a) (2) for the list of watershed planning areas: seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks; and(3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801. The board must establish eligibility criteria and determine whether a planning area is ready to proceed and has the nonstate match committed.
Reduce Sediment by 481 tons/yr and phosphorus by 301 pounds/yr by implementing streambank/ditch stabilization
projects and agricultural practices (estimated 40 Ag Practices, stabilize 2,000 feet of streams/priority drainage system and seal 30 unused wells).
LOCAL LEVERAGED FUNDS