2024 Thief River Watershed Based Funding
The Lower Thief River/State Ditch 83, Marshall County Ditch 20 and Mud River/Judicial Ditch 11 subwatersheds are the Tier 1 planning zones in the Thief River Comprehensive Watershed Management Plan and will be targeted for implementation of structural agricultural practices and streambank/channel stabilization projects. The Lower Thief River is impaired for sediment and negatively impacts the drinking water supply for the City of Thief River Falls. The overall reduction in sediment needed to attain water quality standards is 2,507 tons/year (HSPF), while the 10-year plan goal is a reduction of 2,335 tons/year (PTMApp). Projects will target grade stabilization structures, streambank stabilizations, Forest Stewardship Plans and priority agricultural practices principally in the Lower Thief/State Ditch 83 planning zone, but also in upstream contributing Mud River/Judicial Ditch 11 and Marshall County Ditch 20 Tier 1 priority planning zones and Lost River (Branch 200 of Judicial Ditch 11), Judicial Ditch 30/18/13, and Upper Thief/State Ditch 83 Tier 2 priority planning zones. Targeted practices implemented during this biennium are estimated to reduce sediment loading by 536 tons/year. A Biennial Workplan has been developed and approved by the Thief River.
Annie Felix-Gerth
(a) $39,500,000 the first year and $39,500,000 the second year are for grants to implement state-approved watershed-based plans. The grants may be used to implement projects or programs that protect, enhance, and restore surface PreviouswaterNext quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking PreviouswaterNext sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan program and seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for: (1) implementing state-approved plans, including within the following watershed planning areas (see Chapter 40 Article 2 Section 6(a) (2) for the list of watershed planning areas: seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks; and(3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801. The board must establish eligibility criteria and determine whether a planning area is ready to proceed and has the nonstate match committed.
Reduce sediment by 536 tons/year in the Lower Thief/State Ditch 83 planning zone. This will achieve 23% of the 10-year reduction goal for the Lower Thief/State Ditch 83 planning zone of 2,335 tons/year.
LOCAL LEVERAGED FUNDS