2023 MST Watershed Biased Funding

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$1,099,173
Fund Source
Clean Water Fund
Recipient
Middle-Snake-Tamarac Rivers WD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
December 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Kittson
Marshall
Pennington
Polk
Roseau
Kittson
Marshall
Pennington
Polk
Roseau
Project Overview

The Middle-Snake-Tamarac Rivers Watershed is divided into four planning regions including the Headwaters, Lower Tamarac, Lower Middle, and the Snake River regions. In all four regions, concerns for sediment, stream stability, drainage system instability, groundwater pollution, and excess phosphorus have been identified as either high or medium priority resource concerns in The Comprehensive Watershed Management Plan. Grant activities are estimated to reduce sediment loading by 3,688tons/year and phosphorus loading by 3,236pounds/year through the implementation of structural agricultural practices and streambank/ditch stabilization projects. An estimated 3.25 channel miles of streams and 1.25 channel miles of priority drainage systems will be stabilized, and 30 unused wells will be sealed. This will make progress towards meeting the plan's short-term goals of reducing runoff sediment loading by 11% or 37,300 tons/year, total phosphorus loading by 7% or 24,250 pounds/year, enhancing 20 miles of prioritized stream channels as well as 27 miles of prioritized drainage systems, and sealing 10 unused wells per year.

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7(a), and the Laws of Minnesota, 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(a)
Appropriation Language

2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.

2023 Fiscal Year Funding Amount
$1,099,173
Direct expenses
$0
Proposed Measurable Outcome(s)

Reduce Sediment by 3,688 tons/yr and phosphorus by 3236.40 pounds/yr by implementing streambank/ditch stabilization projects and agricultural practices, stabilize 3.25 miles of streams and 1.25 miles of ditch, and seal 30 unused wells.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Middle-Snake-Tamarac Rivers WD are: Bill Petersen, Bradley Blawat, John W. Nelson, Keith Szczepanski, Robert Kovar
Project Manager
First Name
Katrina
Last Name
Haugen
Organization Name
Middle-Snake-Tamarac Rivers WD
Street Address
453 N McKinley St, PO Box 154
City
Warren
State
MN
Zip Code
56762
Phone
218-745-4741
Email
katrina.haugen@mstrwd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767