2023 Lake Emily Watershed BMP Targeted Implementation Phase IV

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$362,500
Fund Source
Clean Water Fund
Recipient
Pope SWCD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
December 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Pope
Pope
Project Overview

This project targets sediment and TSS reduction in the Lake Emily subwatershed. Funded Best Management Practices will address non-point source pollution from agricultural lands, specifically those on steep, erodible slopes and ravines (root cause) that are delivering sediment and phosphorus to the Chippewa River and Lake Emily, an important local resource as it passes through several highly recreated and populated lakes within Pope County along with highly productive agricultural and wildlife lands. These lands have been converted to row crop production. Pope has 6 landowners ready to implement 44 erosion and sediment control practices. The Pope County Water plan has identified surface water quality and erosion control as the top two priority concerns in the 2013-2023 Comprehensive Water Plan (page 1-17). These two priorities account for 33% of the phosphorus loading to Lake Emily. Lake Emily is identified in the Eight Lake TMDL study and the Pope County Water Plan as being impaired for excessive nutrients. A Water Quality Decision Support App (WQDSA) was used to target the highest contributing areas and this proposal will target the highest contributing direct drainage areas to implement projects. Based on averages calculated from recently constructed WASCOBs in the West Central Area II these projects have the potential to reduce TSS by 1,027 T/year, and 880 lbs/year of TP. This will directly address 44% of Lake Emily's TP annual reduction goal (2,000 lbs) for direct drainage from stormwater runoff.

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(b)
Appropriation Language

(b) $10,762,000 the first year and $11,504,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2023 Fiscal Year Funding Amount
$362,500
Direct expenses
$0
Proposed Measurable Outcome(s)

44 Erosion and Sediment control BMPs will reduce TSS by 1,027 Tons/year and 880 lbs/year of TP. This will directly address 44% of Lake Emily's TP annual reduction goal for direct drainage from stormwater runoff.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Pope SWCD are: D. Gary Reents, Keith Nygaard, Randy Mitteness, Randy Pederson, Tom Talle
Project Manager
First Name
Holly
Last Name
Kovarik
Organization Name
Pope SWCD
Street Address
1680 North Franklin Street
City
Glenwood
State
MN
Zip Code
56334
Phone
320-634-5327
Email
holly.kovarik@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767