2021 Big Elk and Mayhew Lakes Phosphorus Reduction Program

Project Details by Fiscal Year
2021 Fiscal Year Funding Amount
$150,000
Fund Source
Clean Water Fund
Recipient
Benton SWCD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
January 2021
End Date
December 2023
Activity Type
Grants/Contracts
Counties Affected
Benton
Benton
Project Details

Spring time phosphorus loading has been identified as the main concern for Mayhew Lake, whereas summer loads dominate the Big Elk Lake nutrient impairment and Elk River turbidity impairment. Locations have been pinpointed within the watershed where the phosphorus originates from, as well as strategies that may be undertaken to reduce nutrient loading. Practices were strategically chosen to achieve maximum pollution reduction benefits. Some example practices include, nutrient management, feedlot runoff control, manure storage, riparian pasture management, & cropland & streambank erosion control projects. An estimated 673 pounds per year of phosphorus, 274 pounds per year of nitrogen and 684 tons per year of sediment will be reduced by implementing seven projects.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota Session Laws - 2019, 1st Special Session, Chapter 2--S.F.No. 3, Article 2, Section 7(b)
Appropriation Language

(Projects and Practices)(b) $16,000,000 the first year and $16,000,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of this money may be used to seek administrative efficiencies through shared resources by multiple local governmental units. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2021 Fiscal Year Funding Amount
$150,000
Direct expenses
$0
Administration costs
$0
Number of full time equivalents funded
0.14
Proposed Measurable Outcome(s)

There are 16 projects in progress, and we expect to install 7 of them. Combined their estimated reductions are; phosphorus 673 lbs./yr., nitrogen by 274 lbs./yr., BOD by 1,349 lbs./yr., COD by 3,862 lbs./yr., soil by 1,624 T/yr., and TSS by 684 T/yr.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Benton SWCD are: Bernard Thole, Charles Rau, Jake Scherer, Joseph Jordan, Wade Bastian
Project Manager
First Name
Gerry
Last Name
Maciej
Organization Name
Benton SWCD
Street Address
14 2nd Ave W
City
Foley
State
MN
Zip Code
56329
Email
gerry.maciej@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767