2020 - Thief River Watershed Based Funding

Project Details by Fiscal Year
2020 Fiscal Year Funding Amount
$529,892
Fund Source
Clean Water Fund
Recipient
Red Lake WD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
June 2020
End Date
January 2024
Activity Type
Grants/Contracts
Counties Affected
Beltrami
Marshall
Pennington
Beltrami
Marshall
Pennington
Project Details

The Lower Thief River/State Ditch 83 planning zone is a priority in the Thief River Comprehensive Watershed Management Plan. The Lower Thief River is impaired for sediment and negatively impacts the drinking water supply for the City of Thief River Falls. The overall reduction in sediment needed to attain water quality standards is 2,507 tons/year (HSPF), while the 10-year plan goal is a reduction of 2,335 tons/year (PTMApp). This project will target grade stabilization structures, streambank stabilizations, and priority agricultural practices principally in the Lower Thief/State Ditch 83 planning zone, but also in upstream contributing Mud River/Judicial Ditch 11 and Marshall County Ditch 20 Tier 1 priority planning zones and Lost River (Branch 200 of Judicial Ditch 11), Judicial Ditch 30/18/13, and Upper Thief/State Ditch 83 Tier 2 priority planning zones. The targeted practices are estimated to reduce sediment in the Lower Thief/State Ditch 83 planning zone by 598 tons/year, which will achieve 25% of the 10-year plan goal. A Biennial Workplan has been developed and approved by the Thief River Policy Committee and is attached to this request.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7 (a)
Appropriation Language

(a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph.

2020 Fiscal Year Funding Amount
$529,892
Other Funds Leveraged
$82,212
Direct expenses
$529,892
Administration costs
$35,127
Number of full time equivalents funded
1.12835249
Proposed Measurable Outcome(s)

Reduce sediment by 598 tons/year in the Lower Thief/State Ditch 83 planning zone. This will achieve 25% of the 10-year reduction goal for the Lower Thief/State Ditch 83 planning zone of 2,335 tons/year.

Measurable Outcome(s)

This project funded implementation of eight streambank protection and gully stabilization projects, resulting in reduced sediment loading to the Lower Thief River by 1,027 tons/year of sediment.
Funds covered targeted outreach to landowners, a feasibility study for a potential Mud River Restoration project, and technical and engineering work to support implementation. Work primarily addressed sediment loading, which is a priority in the Thief River Comprehensive Watershed Management Plan. Work was done in priority areas.
The work was completed on budget with a one-year grant extension. Clean Water Funds provided leverage for the partnership to pursue and secure additional funds totaling 36,601 from the Red River Watershed Management Board Flood Damage Reduction Work Group.

Proposed Outcomes Achieved
achieved proposed measurable outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Allen Page, Brian Dwight, Gene Tiedemann, Grant Nelson, LeRoy Ose, Terry Sorenson, Tom Anderson
Project Manager
First Name
Tammy
Last Name
Audette
Organization Name
Red Lake WD
Street Address
1000 Pennington Ave S Thief River Falls, MN 56701
City
Thief River Falls
State
MN
Zip Code
56701
Phone
218-681-5800
Email
tammy.audette@redlakewatershed.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767