FY2025 BdS & Mustinka WBIF
This is the third round of watershed based implementation funds to be shared by up to 13 LGU's between the Bois de Sioux River and Mustinka River watersheds. These funds are to implement grant eligible components of the 2021 - 2030 Joint Comprehensive Watershed Management Plan. Activities for this grant application are diverse, reflecting activities planned to improve water quality to and within legal drainage systems, streams, and lakes in the Bois de Sioux and Mustinka River watersheds. Funded practices to include Ag Practices: Filtration/Storage/Protection, Non-Structural Practices, Stream Restoration Development, Multipurpose Drainage Management and Protection Practices, Shoreline BMPs, Septic System Improvements, Urban Stormwater Practices, Well Sealing, Grant Administration, Project Development, Technical Support/Engineering.
Annie Felix-Gerth
(a) $39,500,000 the first year and $39,500,000 the second year are for grants to implement state-approved watershed-based plans. The grants may be used to implement projects or programs that protect, enhance, and restore surface PreviouswaterNext quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking PreviouswaterNext sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan program and seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for: (1) implementing state-approved plans, including within the following watershed planning areas (see Chapter 40 Article 2 Section 6(a) (2) for the list of watershed planning areas: seven-county metropolitan groundwater or surface PreviouswaterNext management frameworks; and(3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801. The board must establish eligibility criteria and determine whether a planning area is ready to proceed and has the nonstate match committed.
Dependent upon final location of project sites, estimates - Ag Practices: Filtration/Storage/Protection will result in reduction of 45 tons sed and 33 lbs total phos. Non-Structural Practices will result in increased 320 acres of soil health, reduction of 30 tons sed and 47 lbs phos. Multipurpose Drainage Mgt and Protection Practices will result in reduction of 90 tons sed and 450 lbs total phos. Shoreline BMPs will result in a reduction of 127 tons sed and 127 lbs total phosph. Septic System Improvements will increase the # of compliant systems by 4. Urban Stormwater Prac. will result in a reduction of 0.25 tons sed and 0.25 lbs total phos. Well Sealing is being used as a placeholder, in case an opportunity arises; will be measured in an increase in compliant systems.
LOCAL LEVERAGED FUNDS