CCWMO Feasibility Studies

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$201,991
Fund Source
Clean Water Fund
Recipient
Carver County WMO
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
September 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Carver
Carver
Project Overview

CCWMO will oversee four separate feasibility studies with the goal of producing plan sets and cost estimates for future projects, as well as writing a feasibility study that meets all BWSR requirements for the management of carp. Studies included: Chain of Lakes Ravine Study will focus on Big Woods East Ravine that has formed between Hwy 41 and the lake that may threaten the structural integrity of Co Hwy 41, and ravine systems that are effecting the Grace Chain of Lakes; Reitz Lake Northwest Ravine Study for a large ravine system that has contributed to a 1,100 square foot delta within the lake, or roughly 3,500 cubic feet of sediment; Carver Creek Bank Failure Study for a large blowout that occurred in 2012, affecting 7,500 square feet of an outside bank along Carver Creek and has increased in size to impact more than 19,000 square feet; and Benton Lake Carp Reduction Feasibility Study that includes a three year work plan to assess fish populations, rearing locations, carp migrations, and fish biomass.

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7(a), and the Laws of Minnesota, 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(a)
Appropriation Language

2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.

2023 Fiscal Year Funding Amount
$201,991
Direct expenses
$0
Administration costs
$0
Proposed Measurable Outcome(s)

Completed feasibility studies with 30% plan sets and engineer's cost estimate to be used to secure future funding to complete the project. For Carp Reduction Study, results in a BWSR Approved Feasibility Study for in-lake management of Carp.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
http://www.co.carver.mn.us/departments/LWS/about_us.asp
Project Manager
First Name
Tim
Last Name
Sundby
Organization Name
Carver County WMO
Street Address
600 E 4th Street
City
Chaska
State
MN
Zip Code
55318
Phone
952-361-1820
Email
tsundby@co.carver.mn.us
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767