Improving Water Quality for Beaver Creek

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$116,897
Fund Source
Clean Water Fund
Recipient
Renville SWCD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
December 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Renville
Renville
Project Overview

The proposed project will be in conjunction with an improvement project to the 103E County Ditch 63 Lateral N (CD 63) system. The project will accomplish the construction of five water and sediment control basins (WASCOB) and five alternate intakes to replace open intakes within the CD63 system, which is the headwaters of Beaver Creek East Fork. The construction and installation of the conservation practices will achieve a reduction of sediment, provide temporary water storage, and reduce peak flows that allow sediment and phosphorus to directly enter impaired Beaver Creek East Fork. Beaver Creek East Fork, which was designated impaired for sediment (TSS) and altered hydrology in the 2017 Hawk Creek Watershed Restoration and Protection Strategies (WRAPS) report, has been prioritize as a Tier 1 (High Priority) impaired stream in the Hawk Creek-Middle Minnesota Comprehensive Watershed Management Plan (HCMM). The project falls within the Beaver Creek watershed (HUC 070200411), which is listed as a priority watershed in the HCMM. The HCMM outlines goals to address the Beaver Creek Watershed and the impaired Beaver Creek East Fork for altered hydrology and soil erosion and sediment loss. The implementation of these conservation practices will achieve an estimated reduction of peak flows by 21% for a 2-year storm, a reduction of 48% for a 10-year storm, and a reduction of 32% for a 25-year storm. These water quality practices will achieve an estimated reduction of 103.02 tons per year (T/yr) of TSS, and 118.47 pounds per year (lbs/yr) of Phosphorus (P).

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(j)
Appropriation Language

(j) $850,000 the first year and $850,000 the second year are for technical assistance and grants for the conservation drainage program, in consultation with the Drainage Work Group, coordinated under Minnesota Statutes, section 103B.101, subdivision 13, and including projects to improve multipurpose water management under Minnesota Statutes, section 103E.015.

2023 Fiscal Year Funding Amount
$116,897
Direct expenses
$0
Proposed Measurable Outcome(s)

Proposed outcomes will create 84.2 ac-ft of storage, reduce peak flows by 21% for a 2-year, 48% for a 10- year, and 32% for a 25-year storm event, as well as achieve an estimated reduction of 103.02 T/yr of TSS, and 118.47 lbs/yr of P.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Renville SWCD are: Dean Schroeder, Kathryn K Kelly, Kevin Kokesch, Mark Koenig, Phil Smith
Project Manager
First Name
Holly
Last Name
Hatlewick
Organization Name
Renville SWCD
Street Address
1008 West Lincoln Street
City
Olivia
State
MN
Zip Code
56277
Phone
320-523-1559
Email
hollyh@renvilleswcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767