Chaska Creek Remeander Phase 2

Project Details by Fiscal Year
2022 Fiscal Year Funding Amount
$283,000
Fund Source
Clean Water Fund
Recipient
Carver County WMO
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
January 2022
End Date
December 2024
Activity Type
Grants/Contracts
Counties Affected
Carver
Carver
Project Details

The project will re-meander approximately 1,100 linear feet of a ditched segment of West Chaska Creek. This is Phase 2 of the project that will connect existing ditch to the constructed meanders from Phase 1 that was completed in 2019. Lengthening the channel will reduce water speeds, lower sheer stress on the banks, reconnect the stream to its floodplain, and reduce the amount of sediment transported downstream. Based on upstream reference reaches and changes observed since the stream was straightened, the re-meander project will reduce total suspended solids by an estimated 4,400 lbs/yr. Secondary benefits include reduction of discharge rates, flood retention, volume reduction, increased habitat for invertebrates, fish, and animals; and a wildlife corridor through a highly industrialized area.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota Session Laws - 2021, 1st Special Session, Chapter 1--H.F.No. 13, Article 2, Section 6(b)
Appropriation Language

(Projects and Practices)(b) $10,762,000 the first year and $11,504,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2022 Fiscal Year Funding Amount
$283,000
Direct expenses
$0
Administration costs
$0
Proposed Measurable Outcome(s)

Based on upstream reference reaches and changes observed since the stream was straightened, the re-meander project will reduce total suspended solids by an estimated 4,400 lbs/yr.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Project Manager
First Name
Tim
Last Name
Sundby
Organization Name
Carver County WMO
Street Address
Planning & Water Management Dept. 600 E 4th Street
City
Chaska
State
MN
Zip Code
55318
Email
tsundby@co.carver.mn.us
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767