2020 NE St. Cloud Sediment Reduction Project

Project Details by Fiscal Year
2020 Fiscal Year Funding Amount
$204,960
Fund Source
Clean Water Fund
Recipient
Benton SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
March 2020
End Date
January 2024
Activity Type
Grants/Contracts
Counties Affected
Benton
Benton
Project Details

Due to the importance of the Mississippi River on local, state, and national levels, the City of St. Cloud made it a priority to actively protect this resource. This project provides the City an opportunity to continue ongoing efforts to reduce pollutant loading to the Mississippi from their NE drainage area, which was identified in the City's Stormwater Management Plan (SWMP) as a high priority source of pollutants (sediments and nutrients). The NE drainage area is a significant source of sediment discharge to the Mississippi River and discharges to the pool of water utilized by the city as their sole drinking water source. St. Cloud completed a watershed drainage analysis for this area and has made the implementation of projects within this subwatershed a high priority.
Two types of best management practices (BMPs) will be implemented to target nutrient/sediment reduction to the Mississippi. The first component will be the retrofitting of existing storm sewer to install sedimentation structures with energy dissipaters which will capture sediment and pollutants prior to directly discharging to the Mississippi River. The sumps will be strategically placed within the subwatershed maximizing the amount of runoff treated. The second will include the addition of a rainwater garden as a partnership with the redevelopment of private property, the Culligan Redevelopment Project. These activities will result in the removal of approximately 1,800 lbs of sediment per year.
These efforts are part of an established 15-year implementation project that Benton Soil and Water Conservation District (SWCD) and St. Cloud have been partnering on since 2014. St. Cloud, Benton SWCD, the Board of Water and Soil Resources (BWSR), and the MN Pollution Control Agency (MPCA) have contributed to the installation of 6 individual projects, resulting in 35.3% progress towards our 15-year, 70% overall sediment reduction goal. This project will result in a total 37.2% progress towards the goal

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7(b)
Appropriation Language

(b) $16,000,000 the first year and $16,000,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of this money may be used to seek administrative efficiencies through shared resources by multiple local governmental units. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2020 Fiscal Year Funding Amount
$204,960
Other Funds Leveraged
$359,854
Direct expenses
$204,960
Administration costs
$3,360
Number of full time equivalents funded
0.08045977
Proposed Measurable Outcome(s)

The proposed practices specifically target sediments from urban stormwater runoff, and will result in the removal of approximately 1,800 lbs of total suspended solids, annually.

Measurable Outcome(s)

Actual Results(4,800 pounds of TSS/year) exceeded proposed reduction estimate of 1,800 pounds of TSS/Year.

Proposed Outcomes Achieved
achieved proposed measurable outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Bruce Brenny, Charles Rau, Joseph Jordan, Mike Winkleman, Wade Bastian
Project Manager
First Name
Gerry
Last Name
Maciej
Organization Name
Benton SWCD
Street Address
14 2nd Ave W Foley, MN 56329
City
Foley
State
MN
Zip Code
56329
Phone
320-968-5300
Email
gerry.maciej@mn.nacdnet.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767