Bryn Mawr Meadows Water Quality Improvement Project

Project Details by Fiscal Year
2020 Fiscal Year Funding Amount
$400,000
Fund Source
Clean Water Fund
Recipient
Bassett Creek Watershed Management Commission
Recipient Type
Local/Regional Government
Status
Completed
Start Date
May 2020
End Date
June 2024
Activity Type
Grants/Contracts
Counties Affected
Hennepin
Hennepin
Project Details

This project will capture and treat runoff from 45.1 acres of residential area in Minneapolis, just west of downtown. Currently runoff from this area flows untreated into nearby Bassett Creek. A feasibility study for this project was completed in January 2019 and estimates the project will reduce total phosphorus and total suspended solids by 30 and 10,469 lbs/year, respectively. The project includes the creation of new storm water management ponds as water features within Bryn Mawr Meadows Park and will be implemented to capitalize on a park reconstruction project planned by the Minneapolis Park and Recreation Board with design scheduled for 2021 and construction in 2022.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7(b)
Appropriation Language

(b) $16,000,000 the first year and $16,000,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of this money may be used to seek administrative efficiencies through shared resources by multiple local governmental units. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2020 Fiscal Year Funding Amount
$400,000
Other Funds Leveraged
$281,206
Direct expenses
$400,000
Administration costs
$4,806
Number of full time equivalents funded
0.019157088
Proposed Measurable Outcome(s)

Treat stormwater runoff from 45.1 ac, currently untreated area
Reduce TP and TSS loads to Bassett Cr and Mississippi R by 30 and 10,469 lbs/yr, respectively
Use native plants for pollinator & riparian habitat
Include educational features & signs

Measurable Outcome(s)

This project created two stormwater management ponds totaling 21,780 square feet and a 0.06 acre native vegetation buffer, resulting in 37 lbs/year of phosphorus and 6.3 tons/year of total suspended solids (sedmient) reduction to Bassett Creek. An educational sign will be installed onsite after the grant expires.

Proposed Outcomes Achieved
achieved proposed measurable outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Catherine Cesnik, Clint Carlson, David Johnston, Dr. Monika Vadali, Jennifer Leonardson, Jere Gwin-Lenth, Joan Hauer, Jodi Polzin, Paula Pentel, RJ Twiford, Shaun Kennedy, Stacy Harwell, Terri Schultz, Wayne Sicora
Project Manager
First Name
Laura
Last Name
Jester
Organization Name
Bassett Creek Watershed Management Commission
Street Address
P.O. Box 270825 Golden Valley, MN 55427
City
Golden Valley
State
MN
Zip Code
55427
Phone
952-270-1990
Email
laura.jester@keystonewaters.com
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767