Lower Rice Creek Stabilization Project

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$568,104
Fund Source
Clean Water Fund
Recipient
Rice Creek WD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
February 2019
End Date
December 2021
Activity Type
Grants/Contracts
Counties Affected
Anoka
Ramsey
Anoka
Ramsey
Project Overview

The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.

Project Details

The Rice Creek Watershed District (RCWD) is proposing to improve water quality and habitat in Locke Lake (02-0077) and Lower Rice Creek. We would achieve this outcome by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. We propose to construct a variety of stream stabilization practices, each selected to target the specific cause of the instability at individual sites. Eleven bank stabilization practices would be installed over a continuous 5400-foot reach in Lower Rice Creek. Bank stabilization practices would include vegetation restoration, tree and boulder resentment, and rock barbs with live-stakes.
Diagnostic and feasibility studies for Locke Lake and Lower Rice Creek have shown that most of the sediment entering the lake is from unstable and eroding streambanks and bluffs along the Lower Rice Creek corridor. Stabilizing the streambanks was found to be the most feasible and cost-effective option for addressing the root cause of the problem. The eroding streambanks have been prioritized based on measured erosion rates, and the feasibility of conceptual designs have been selected to work towards meeting the sediment reduction goal of 80%. The stabilization practices proposed in this grant application are located in the top priority reach and will provide the biggest reduction of any on the reaches considered from restoration/stabilization.
The anticipated outcome of this project is a reduction in bank erosion by more than 4,721 cubic yards per year and the prevention of 2,874 tons/year of sediment deposition in Locke Lake. The total project cost is $710,130 and will achieve 58% of our erosion reduction goals for Lower Rice Creek.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
no
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2017, Chapter 91, Article 2, Sec 7, (b)
Appropriation Language

$6,882,000 the first year and $12,618,000 the second year are for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2019 Fiscal Year Funding Amount
$568,104
Other Funds Leveraged
$144,725
Direct expenses
$522,946
Administration costs
$25,088
Number of full time equivalents funded
0.090996169
Proposed Measurable Outcome(s)

The Lower Rice Creek Stabilization Project will decrease bank erosion by 4,721 cubic yards per year, reduce sediment deposition in Locke Lake by 2,874 tons per year, prevent a new TSS impairment, and improve habitat for fish and invertebrates.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 2874 lbs of Phosphorus, 2874 tons of Sediment,

Proposed Outcomes Achieved
Achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Ali Chalberg,Anna Grace,Ashlee Ricci,Catherine Nester,John Waller,Kelsey White,Kendra Sommerfeld,Marcie Weinandt,Matthew Kocian,Michael Bradley,Michelle Jordan,Mitch Sommers,Molly Nelson,Nick Tomczik,Patricia Preiner,Patrick Hughes,Ron Leaf,Steve Wagamon,Terrence Chastan-Davis,Theresa Stasica,Tom Schmidt
Project Manager
First Name
Nick
Last Name
Tomczik
Organization Name
Rice Creek WD
Street Address
4325 Pheasant Ridge Dr NE #611
City
Blaine
State
MN
Zip Code
55449
Phone
763-398-3070
Email
ntomczik@ricecreek.org