Lake City Stormwater Improvement Project

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$181,900
Fund Source
Clean Water Fund
Recipient
Goodhue SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2019
Activity Type
Grants/Contracts
Counties Affected
Goodhue
Goodhue
Project Overview

The goal of this project is to reduce peak stormwater flow discharge, sediment and phosphorus from directly entering Lake Pepin by installing two stormwater infiltration basins treating a total of 15.8 acres of developed residential and commercial area in Lake City in conjunction with the Highway 61 road reconstruction project scheduled for 2020 reducing total phosphorus by 13 pounds per year and sediment by 2 tons per year.

Project Details

Projects and Practices 2019

Competitive Grant Making Body
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(b)
Appropriation Language

for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2019 Fiscal Year Funding Amount
$181,900
Other Funds Leveraged
$32,488
Direct expenses
$116,241
Administration costs
$3,974
Proposed Measurable Outcome(s)

Two bio-infiltration basins will be installed reducing total phosphorus by 12.9 (lbs/yr) total suspended solids by 4,387 (lbs/yr) in this HSPF subbasin, and peak flow reduction by 83% (16.8 ac-ft/yr) within this direct drainage area.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 16.83 acre-feet/year volume reduced; 12.9 pounds/year phosphorus; 4,387.9 pounds/year total suspended solids.

Proposed Outcomes Achieved
achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Goodhue SWCD are: Ed McNamara, James Hedeen, Jeff Beckman, John Jaeger, Larry Thomforde, Les Kyllo, Mark Comstock, Steve McNamara
Project Manager
First Name
Beau
Last Name
Kennedy
Organization Name
Goodhue SWCD
Street Address
104 East 3rd Avenue; 14414 County 50 Blvd
City
Goodhue
State
MN
Zip Code
550270158
Phone
651-923-5286 x3
Email
bkennedy@goodhueswcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767