Judicial Ditch No. 2 Outlet Gully Stabilization Project
Otter Tail County will partner with the Buffalo-Red River Watershed District and the West Otter Tail and Wilkin SWCDs to stabilize the outlet of Judicial Ditch No. 2 which has become the most critically eroding gully contributing sediment to the Otter Tail River. When stabilized, sediment to the river will be reduced by 988 tons per year, and total phosphorus will be reduced by 840 pounds per year. The sediment reduction associated with this project is 7 percent of the 6,868 tons per year goal set by the Lower Otter Tail River Total Maximum Daily Load.
Projects and Practices 2019
Annie Felix-Gerth
for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.
Sediment Load will be reduced by 988 tons per year. When considering distance between the J.D. No. 2 and the Lower Otter Tail River TMDL reach, the sediment reduction associated with this project is 7 percent of the 6,868 tons per year TMDL goal.
This project has resulted in an estimated annual reduction of 1102.5 pounds of Phosphorus, 1250.5 tons of Sediment.
LOCAL LEVERAGED FUNDS