Johnny Cake Ridge Road Phosphorus Reduction BMP Retrofit

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$300,000
Fund Source
Clean Water Fund
Recipient
Apple Valley, City of
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2019
Activity Type
Grants/Contracts
Counties Affected
Dakota
Dakota
Project Overview

The project involves installation of a number of stormwater best management practices in the road right-of-way and on adjacent public property during reconstruction of Johnny Cake Ridge Road and installation of the Dakota County North Creek Greenway. Practices implemented will include boulevard raingardens, tree trenches, and underground sediment collection practices. The project is anticipated to reduce phosphorus to Long Lake by 9 pounds per year, about 17% of the remaining watershed phosphorus load reduction needed to meet water quality goals of the Long and Farquar Lakes Nutrient Total Maximum Daily Load.

Project Details

Projects and Practices 2019

Competitive Grant Making Body
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(b)
Appropriation Language

for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2019 Fiscal Year Funding Amount
$300,000
Other Funds Leveraged
$328,126
Direct expenses
$300,000
Administration costs
$0
Proposed Measurable Outcome(s)

P8 modeling from the 2017 Long and Farquar Lakes Implementation Plan Update estimates a phosphorus reduction of 8.9 lbs/yr to Long Lake and 29.7 lbs/yr to upstream ponds. P Reductions to Farquar Lake and stormwater volume reduction are also predicted

Measurable Outcome(s)

Installed 6 stormwater BMPs that provided 5.10 pounds/year of phosphorous reduction. The feasibility study for the project included a suite of smaller-scale BMPs, such as tree trenches in smaller infiltration areas, that were based on concept level ideas and were not feasible in the final design due to small right of way areas and utility conflicts or were cost-prohibitive to install.

Proposed Outcomes Achieved
achieved some of the proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Apple Valley, City of are:
Project Manager
First Name
Jane
Last Name
Byron
Organization Name
Apple Valley, City of
Street Address
7100 W 147th St; 7100 West 147th Street
City
Apple Valley
State
MN
Zip Code
55124
Phone
952-953-2462
Email
jbyron@ci.apple-valley.mn.us
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767