Minnehaha Greenway - 325 Blake Road Stormwater Management Project

Project Details by Fiscal Year
2018 Fiscal Year Funding Amount
$370,000
Fund Source
Clean Water Fund
Recipient
Minnehaha Creek WD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
May 2018
End Date
August 2023
Activity Type
Grants/Contracts
Counties Affected
Hennepin
Hennepin
Project Details

Over the last century, urbanization of the areas around Minnehaha Creek has degraded water quality in the iconic waterway. Ditching of the stream channel, loss of wetlands, bridge crossings and increased impervious surface have had a variety of negative effects on the ecological integrity of the creek: disrupted fluvial processes, increased runoff and pollutant loads, decreased infiltration, reduced baseflow, and fragmented and degraded in-stream and streambank habitat. As part of a larger comprehensive series of projects, the Minnehaha Creek Watershed District (MCWD) made a strategic acquisition of land at 325 Blake Road, Hopkins MN, as part of a regional scale effort to establish to address the aforementioned surface water impairments and expand the Minnehaha Greenway - an area of restored stream, protected riparian area, community green space and vast trail network.

The 325 Blake Road Stormwater Management Project is designed to manage area-wide stormwater runoff volumes from over 260 acres in a manner that addresses pollutant loading to Minnehaha Creek and downstream Lake Hiawatha, reduces peak runoff rates, and improves baseflow in an expanded and restored section of riparian greenway. The project included in this application is for construction of the final phase, the onsite treatment facility. Two previous projects, Powell Road diversion and Lake Street diversion, have been constructed and complete the piped diversion of approximately 260 acres from two major drainage areas for discharge at the 325 Blake Road site. Once this final phase is complete the project is designed to reduce stormwater volumes by approximately 11.82 acre-feet and reduce total phosphorus loading by an estimated 181 lbs/yr through various stormwater practices (filtration and infiltration methods).

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
no
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2017, 1st Special Session, Chapter 91, Article 2, Section 7 (b)
Appropriation Language

(b) $6,882,000 the first year and $12,618,000 the second year are for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2018 Fiscal Year Funding Amount
$370,000
Other Funds Leveraged
$500,000
Direct expenses
$370,000
Administration costs
$20,000
Number of full time equivalents funded
0.057471264
Proposed Measurable Outcome(s)

The project is designed to reduce stormwater volumes by approximately 11.82 acre-feet and reduce total phosphorus loading by a modeled estimate of 181 lbs/yr through infiltration/filtration methods.

Measurable Outcome(s)

Construction of the water treatment facilities did not take place during the grant period due to the developer and contractor pulling out of the project necessitating a re-bid. The scope of the overall project is still in place however construction will be outside of the grant period so the grant funds were shifted to the design costs.

Proposed Outcomes Achieved
achieved none of the proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Arun Hejmadi, Eugene Maxwell, Jessica Loftus, Richard Miller, Sherry Davis White, Steve Sando, William Olson
Project Manager
First Name
Becky
Last Name
Christopher
Organization Name
Minnehaha Creek WD
Street Address
15320 Minnetonka Blvd Minnetonka, MN 55345
City
Minnetonka
State
MN
Zip Code
55345
Phone
952-471-0590
Email
bchristopher@minnehahacreek.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155