Lake St. Croix Direct Discharge Stormwater Retrofit Phase III

Project Details by Fiscal Year
2018 Fiscal Year Funding Amount
$33,440
Fund Source
Clean Water Fund
Recipient
Middle St. Croix River WMO
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2018
End Date
January 2020
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Details

This project continues to systematically address the stormwater discharge from a 1,852 acre pipe shed directly discharging to Lake St. Croix through the installation of targeted stormwater treatment Best Management Practices prioritized in the 2014 Lake St. Croix Direct Discharge Stormwater Retrofit Analysis. The goal of this project is to reduce urban pollutant loading to Lake St. Croix by at least 10 pounds phosphorous and 1 acre foot of stormwater per year through the installation of up to 20 low impact development practices identified.

Competitive Grant Making Body
Board Members and Qualifications

See http://www.bwsr.state.mn.us/aboutbwsr/index.html and http://www.bwsr.state.mn.us/aboutbwsr/boarddirectory.pdf

Advisory Group Members and Qualifications

See http://www.bwsr.state.mn.us/aboutbwsr/index.html

Conflict of Interest Disclosed
No
Conflict of Interest Contact

Marcey Westrick

Legal Citation / Subdivision
Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(b) (BWSR Projects and Practices 2018)
Appropriation Language

$6,882,000 the first year and $12,618,000 the second year are for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2018 Fiscal Year Funding Amount
$33,440
Other Funds Leveraged
$11,375
Direct expenses
$33,440
Administration costs
$1
Proposed Measurable Outcome(s)

The goal of this project is to reduce urban pollutant loading to Lake St. Croix by at least 10.0 pounds phosphorous and 2,600 pounds TSS and 1.0 acre foot of stormwater per year through the installation of up to 20 low impact development practices id

Measurable Outcome(s)

Due to limited available funding, this project was awarded less than requested. However, the grantee achieved the proposed outcomes from their workplan, which was based on the reduced funding amount. The project resulted in an estimated annual reduction of 1 acre/ft of water, 10 lbs of phosphorus, and 1.25 tons of sediment (TSS).

Proposed Outcomes Achieved
achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Project Manager
First Name
Mikael
Last Name
Isensee
Organization Name
Middle St. Croix River WMO
Street Address
455 Hayward Ave
City
Oakdale
State
MN
Zip Code
55128
Phone
651-320-8220 x 22
Email
misensee@mnwcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767