All Projects

77 Results for
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$31,328
Fund Source

The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Metropolitan Council/University of Minnesota - St. Anthony Falls Laboratory
2013 Fiscal Year Funding Amount
$66,562
2014 Fiscal Year Funding Amount
$33,438
Fund Source

The Twin Cities metropolitan area has a rich history and connection with its waters. In an effort to keep surface waters clean, a wide variety of stormwater practices have been developed and installed throughout the metro in recent years. Many of these, such as rain gardens and infiltration basins and trenches, are intended to reduce the total runoff volume by infiltrating stormwater. Six to seven aquifers underlie the metro area and provide residents with drinking water.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council
2009 Fiscal Year Funding Amount
$67,899
2010 Fiscal Year Funding Amount
$79,070
2010 Fiscal Year Funding Amount
$75,783
2011 Fiscal Year Funding Amount
$64,020
2011 Fiscal Year Funding Amount
$85,473
2012 Fiscal Year Funding Amount
$70,469
2013 Fiscal Year Funding Amount
$179,573
2014 Fiscal Year Funding Amount
$160,004
Fund Source

In 2005, Metropolitan Council was directed to carry out regional water supply planning activities under Minnesota Statutes, section 473.1565. Working closely with the region's many water supply stakeholders and under the guidance of a metropolitan area water supply advisory committee, Metropolitan Council developed and adopted a metropolitan area master water supply plan (master plan) in 2010. The plan provides a framework for water supply planning and identifies actions needed to achieve the goal of ensuring sustainable water supplies across the region.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Two Rivers Watershed District
2013 Fiscal Year Funding Amount
$200,000
Fund Source

Lake Bronson is the only major recreational lake in Kittson County. The project is a continuation project from FY2012 and will reduce runoff and decrease movement of sediment, nutrients and bacteria by targeting, prioritizing and installing vegetative practices and installing Side Water Inlets within the Lake Bronson watersheds. Emphasis will be placed on the South Branch of Two Rivers. There is a portion of impaired stream reach as identified by the Minnesota Pollution Control, which directly feeds Lake Bronson.

Kittson
Marshall
Roseau
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Two Rivers Watershed District
2012 Fiscal Year Funding Amount
$179,348
2013 Fiscal Year Funding Amount
$99,933
Fund Source

This project will include analysis of existing and newly collected water quality data to verify the impairments on the currently listed reaches and to determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a focus throughout the Watershed Approach Project. The project provides an opportunity to assess and leverage the capacity for the local community to engage in the process of watershed management and to adopt protection and restoration practices.

Kittson
Marshall
Roseau
2021 Fiscal Year Funding Amount
$0
2020 Fiscal Year Funding Amount
$0
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Anoka
Benton
Carlton
Carver
Cook
Dakota
Goodhue
Hennepin
Isanti
Kanabec
Lake
Meeker
Mille Lacs
Morrison
Ramsey
Scott
Sherburne
St. Louis
Washington
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$119,888
Fund Source

This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.

Olmsted
Wabasha
Winona
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$4,826
Fund Source

This project will support the review of all public comments submitted for the North Fork Crow River TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
City of Apple Valley
2013 Fiscal Year Funding Amount
$158,214
Fund Source

In 2002, Farquar and Long Lakes were placed on the impaired waters list due to high phosphorus levels that caused algal blooms and reduced water clarity. The City of Apple Valley is proposing a combination of two enhancements to achieve a 61 pound reduction in phosphorus.

Dakota
Recipient
Pioneer Sarah Creek Watershed District
2013 Fiscal Year Funding Amount
$103,415
Fund Source

This project will complete a Watershed Restoration and Protection (WRAP) Plan that includes a set of pollutant reduction and watershed management strategies to achieve water quality standards for the listed pollutants, and that are understood and adoptable by local units of government and other stakeholders. This project will also provide an important water quality framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Wright
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
Sand Hill Watershed District
2013 Fiscal Year Funding Amount
$106,249
Fund Source

The goals of the Sand Hill River WRAP will be accomplished in two project phases.

Mahnomen
Norman
Polk
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
City of Lakeville
2013 Fiscal Year Funding Amount
$2,682
Fund Source
Identify, verify and update well and hazardous waste generator database
Dakota
Recipient
City of Long Prairie
2013 Fiscal Year Funding Amount
$3,038
Fund Source
Newsletter mailing to property owners within DWSMA; Information about nitrate testing, hazardous waste, class V wells, SSTS, storage tanks; Provide support for Todd County SWCD Enviro Fest
Todd
Recipient
City of Annandale
2013 Fiscal Year Funding Amount
$5,971
Fund Source
Develop the City Emergency Response Plan
Wright
Recipient
City of Otsego
2013 Fiscal Year Funding Amount
$3,851
Fund Source
PCSI for private wells within the DWSMA; Install bollards at wellheads #3, #4, #7
Wright
Recipient
City of Eagan
2013 Fiscal Year Funding Amount
$4,788
Fund Source
Update locations of potential contaminant sources
Dakota
Recipient
City of South St. Paul
2013 Fiscal Year Funding Amount
$10,000
Fund Source
Update potential contaminant source database; Promote sealing of unused, poorly maintained, damaged or abandoned wells; Assist property owners to seal unused wells
Dakota
Recipient
City of Otsego
2013 Fiscal Year Funding Amount
$2,909
Fund Source
Mailer about well management and nitrate testing clinic; Puchase spectrophotometer
Wright
Recipient
Good Shepherd Free Lutheran Church
2013 Fiscal Year Funding Amount
$3,937
Fund Source
Install an 18 GPM Arsenic Removal System
Wright
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$952
Fund Source

This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2013 Fiscal Year Funding Amount
$109,128
Fund Source

The goal of the project is to sustain the existing Volunteer Nitrate Monitoring Network (VNMN) domestic well network for long-term groundwater quality studies by generating ambient groundwater quality data in domestic drinking water wells completed in various southeastern Minnesota aquifers, contrasting vulnerable and non-vulnerable hydrogeologic settings.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Red Lake County SWCD
2013 Fiscal Year Funding Amount
$40,400
Fund Source

Stormwater along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.

Red Lake
Recipient
Rice County Environmental Services
2013 Fiscal Year Funding Amount
$31,500
Fund Source

The goal of this project is to reduce the number of vulnerable unused wells located within sensitive areas and to prevent potential groundwater contamination. This project will provide cost-share well sealing funds to target sealing of unused wells located in highly vulnerable areas within both the City of Faribault, and the City of Northfield's Drinking Water Supply Management Areas (DWSMA), and other vulnerable areas of Rice County.

Rice
Recipient
Houston Engineering
2013 Fiscal Year Funding Amount
$33,096
Fund Source

This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$450,000
Fund Source

The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.

Benton
Carver
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Sherburne
Stearns
Wright
Recipient
Metropolitan Council/Barr Engineering Company
2012 Fiscal Year Funding Amount
$20,789
2013 Fiscal Year Funding Amount
$135,416
2014 Fiscal Year Funding Amount
$66,495
2015 Fiscal Year Funding Amount
$5,662
2017 Fiscal Year Funding Amount
$2,698
2018 Fiscal Year Funding Amount
$26,377
Fund Source

State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metropolitan Council
2012 Fiscal Year Funding Amount
$16,549
2013 Fiscal Year Funding Amount
$73,308
Fund Source

Regional recharge modeling with the Twin Cities daily soil water balance (SWB) model has been a fundamental part of the Metropolitan Council’s groundwater flow modeling effort and supports the Metropolitan Area Master Water Supply Plan. The SWB model is used to evaluate the impact of planned and potential land use and climate on recharge in the eleven-county metropolitan area, and supports the ongoing update of the regional groundwater flow model.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metropolitan Council
2022 Fiscal Year Funding Amount
$919,000
2021 Fiscal Year Funding Amount
$1,000,000
2020 Fiscal Year Funding Amount
$1,000,000
2019 Fiscal Year Funding Amount
$950,000
2018 Fiscal Year Funding Amount
$950,000
2017 Fiscal Year Funding Amount
$975,000
2016 Fiscal Year Funding Amount
$975,000
2015 Fiscal Year Funding Amount
$550,000
2014 Fiscal Year Funding Amount
$1,537,000
2013 Fiscal Year Funding Amount
$500,000
2012 Fiscal Year Funding Amount
$500,000
2011 Fiscal Year Funding Amount
$400,000
2010 Fiscal Year Funding Amount
$400,000
Fund Source

This program supports communities as they plan and implement projects that address emerging drinking water supply threats. It supports the exploration cost-effective regional and sub-regional solutions, leverages inter-jurisdictional coordination, and prevents overuse and degradation of groundwater resources.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington