Showing 1 - 40 of 938 | Export projects
Recipient
Minnesota State University-Mankato
2010 Fiscal Year Funding Amount
$260,000
Fund Source

MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.

Recipient
Water Resources Center, Minnesota State University- Mankato
2013 Fiscal Year Funding Amount
$80,546
Fund Source

The goal of this project is monitor, record, and submit the dataset necessary for assessment of aquatic recreation use with the Watonwan Watershed.

Recipient
City of St. Cloud
2015 Fiscal Year Funding Amount
$575
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.

Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.

Recipient
Elk River Watershed Association
2017 Fiscal Year Funding Amount
$182,500
Fund Source

A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.

Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$6,600
Fund Source

The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.

Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Recipient
Benton SWCD
2018 Fiscal Year Funding Amount
$175,000

These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.

Recipient
Benton SWCD
2018 Fiscal Year Funding Amount
$456,500

The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.

Recipient
Pheasants Forever
2019 Fiscal Year Funding Amount
$5,061,000
Fund Source

This proposal accelerates the strategic permanent protection of 915 acres (220 wetlands and 695 grasslands) of Waterfowl Production Areas (WPAs) open to public hunting in Minnesota. Pheasants Forever (PF) will strategically acquire parcels that are adjacent to existing public land or create corridors between complexes. All acquisitions will occur in the prairie, prairie/forest transition, or metro regions.

Recipient
Pheasants Forever
2019 Fiscal Year Funding Amount
$5,740,000
Fund Source

This proposal accelerates the protection of 1,030 acres of strategic prairie grassland, wetland, and other wildlife habitats as State Wildlife Management Areas (WMA) open to public hunting. Pheasants Forever (PF) will be acquiring tracts that build onto or create a corridor between existing protected lands which will be transferred to the MN Department of Natural Resources (MN DNR) to be included as a WMA. All acquisitions will occur within the prairie, prairie/forest transition, and metro planning regions. These areas have seen the greatest decline in upland and wetland habitat.

2011 Fiscal Year Funding Amount
$150,000
2010 Fiscal Year Funding Amount
$150,000
Fund Source

Provided for an increase in public service, security and enforcement, maintenance and custodial work at high participation locations during the first two fiscal years of Legacy.

Recipient
Pheasants Forever
2011 Fiscal Year Funding Amount
$3,505,000
Fund Source

Pheasants Forever (PF) and the U.S. Fish and Wildlife Service (Service) will cooperate to permanently restore and protect approximately 1397.31 acres as Waterfowl Production Areas (WPAs) in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.

Recipient
Department of Natural Resources
2011 Fiscal Year Funding Amount
$5,833,000
Fund Source

With these funds we were able to restore, protect, and enhance 24,611 acres of native and restored grassland in Minnesota. Much of this work was done through the DNR Roving Crews, a new program funded with these dollars that has significantly increased the state's habitat management capabilities. In addition to these enhancement activities we were able to enroll acres in the DNR's Native Prairie Bank Easement Program as well as acquire acres for the SNA program.

Recipient
DNR
2013 Fiscal Year Funding Amount
$4,300,000
Fund Source

The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457

Recipient
DNR
2014 Fiscal Year Funding Amount
$1,790,000
Fund Source

Many of Minnesota's wetlands have been lost and the remainder degraded.  The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife.  The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.

Recipient
MN DNR
2012 Fiscal Year Funding Amount
$6,500,000
Fund Source

We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.

Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$3,416,000
Fund Source

Accomplishments of the appropriation include: i) protection of 3.9 miles of shoreline; ii) modification of 4 lake outlet structures to allow fish passage, benefiting 1,264 acres; iii) enhanced river and stream functions at 15 sites, benefiting over 17 river miles; and iv) enhance 4.5 miles of shoreline habitat on publicly-owned lakeshore.

Recipient
DNR
2013 Fiscal Year Funding Amount
$3,870,000
Fund Source

This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program.  Ten thousand acres of wetlands were enhanced by these activities.

Recipient
MN DNR
2012 Fiscal Year Funding Amount
$1,652,000
Fund Source

This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.

Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$1,791,000
Fund Source

This program will increase populations of a variety of game and non-game wildlife species by protecting and enhancing forest habitats on which wildlife depends. This program of on-the-ground forest conservation projects will amplify the wildlife value of forest communities on DNR administered forestlands. Our forest enhancement will treat 4,472 ac. These activities are not conducted as part of the DNR's commercial timber operations. Additionally, our program will acquire 404 acres of forestland that contributes to habitat complexes and other high priorities.

Recipient
DNR - Fisheries & Wildlife
2011 Fiscal Year Funding Amount
$6,505,000
Fund Source

Ducks Unlimited and Minnesota DNR Section of Wildlife completed 26 project affecting 7,603 acres, including three wetland restoration projects restoring 97 acres, 18 shallow lake enhancement projects enhancing 7,154 wetland acres, and five fee-title land acquisition projects protecting 352 acres.

Recipient
Department of Natural Resources
2010 Fiscal Year Funding Amount
$1,700,000
Fund Source

The Minnesota Department of Natural Resources Accelerated Prairie Grassland Restoration and Management Program had a successful first round of funding from the Legacy Funds. The program worked through the growing pains and obstacles in getting a new program up and operational and was successful in enhancing nearly 5,800 acres of prairie and grasslands in eight of the ecological subsections of Minnesota. A contractor base has been established for this type of work statewide that needs to be evaluated and expanded on for future appropriations.

Recipient
DNR
2016 Fiscal Year Funding Amount
$4,880,000
Fund Source

We propose restoration and enhancement of prairie and savanna on WMA’s, SNA’s, and Native Prairie Banks in Minnesota and restoration and enhancement of bluff prairies on State Forest Land in southeast Minnesota.

Recipient
DNR
2015 Fiscal Year Funding Amount
$1,050,000
Fund Source

Many of Minnesota's wetlands have been lost and the remainder degraded.  Recent tiling and ditching have accelerated this situation.  Through this proposal, shallow lakes and wetlands will be designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents.

2011 Fiscal Year Funding Amount
$246,000
2010 Fiscal Year Funding Amount
$154,000
Fund Source

This project will restore and manage native prairies and woodlands, including removal of invasive species along at least six percent of the developed miles of state trails

2011 Fiscal Year Funding Amount
$82,603
2010 Fiscal Year Funding Amount
$78,000
Fund Source

This project aims to accelerate natural resource management activities within state park boundaries

Recipient
Pheasants Forever
2014 Fiscal Year Funding Amount
$6,830,000
Fund Source

This proposal accelerates the permanent protection of 1,800 acres of wetlands (720 acres) and grasslands (1080 acres) as Waterfowl Production Areas open to public hunting in Minnesota.

Recipient
Pheasants Forever
2014 Fiscal Year Funding Amount
$7,960,000
Fund Source

The proposal was to accelerate the protection of 1,220 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. Over the course of the appropriation, we acquired 11 parcels for a total of 1,484.05 acres which exceeded our total acre goal of 1,220 acres by 264.05 acres.  Breaking down acres by ecological section we acquired 876 acres in the metro, 152 acres in the forest/prairie, and 456 acres in the prairie.  We have a balance of $52,798 that will be returned to the Fund despite exceeding our acre goals.

Recipient
Pheasants Forever with USFWS
2015 Fiscal Year Funding Amount
$7,280,000
Fund Source

This proposal accelerates the permanent protection of 887 acres of wetlands (353 acres) and grasslands (534 acres) as Waterfowl Production Areas open to public hunting in Minnesota.

Recipient
Pheasants Forever
2012 Fiscal Year Funding Amount
$9,815,000
Fund Source

This program accelerated the permanent protection of 2,267 acres of wetlands (465 acres) and grasslands (1,802 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 18 parcels for a total of 2,267 acres which exceeded our total acre goal of 2,250 acres by 17 acres. Breaking down acres by ecological section we exceeded our acre goal for both the metropolitan area by 61 acres and in the prairie area by 346 acres. We have exceeded anticipated match of $5,125,000 by $771,500.

Recipient
Pheasants Forever
2015 Fiscal Year Funding Amount
$10,350,000
Fund Source

This proposal accelerates the protection of 1,362 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.

Recipient
Pheasants Forever
2018 Fiscal Year Funding Amount
$5,500,000
Fund Source

This proposal accelerates the permanent protection of 235 acres of wetlands and 765 acres of grasslands for a total of 1,000 acres as Waterfowl Production Areas open to public hunting in Minnesota.

Recipient
Pheasants Forever
2016 Fiscal Year Funding Amount
$7,620,000
Fund Source

This proposal accelerates the permanent protection of 900 acres of wetlands (225 acres) and grasslands (675 acres) as Waterfowl Production Areas open to public hunting in Minnesota.

Recipient
Pheasants Forever
2017 Fiscal Year Funding Amount
$5,650,000
Fund Source

This proposal accelerates the permanent protection of 760 acres of wetlands (175 acres) and grasslands (585 acres) as Waterfowl Production Areas open to public hunting in Minnesota.

Recipient
Pheasants Forever
2018 Fiscal Year Funding Amount
$5,603,000
Fund Source

This proposal accelerates the protection of 1,012 acres of strategic prairie grassland, wetland, and other wildlife habitats as State Wildlife Management Areas open to public hunting.

Recipient
Pheasants Forever
2016 Fiscal Year Funding Amount
$7,452,000
Fund Source

This proposal accelerates the protection of 900 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.

Recipient
Pheasants Forever
2017 Fiscal Year Funding Amount
$5,229,000
Fund Source

This proposal accelerates the protection of 680 acres of strategic prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.