All Projects

Showing 1 - 19 of 19 | Export projects
Recipient
Red Lake SWCD
2014 Fiscal Year Funding Amount
$10,930
Fund Source

The purpose of this project is to conduct an inventory of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.

Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$66,263
Fund Source

The Clearwater River from the Lost River to Beau Gerlot Creek and from the Lower Badger Creek to the Red Lake River is on the Total Maximum Daily Load Impaired Waters List for Turbidity. Red Lake County Soil and Water Conservation District (SWCD) has targeted five sites in the Terrebonne Creek, Beau Gerlot Creek, and Lower Badger Creek subwatersheds of the Clearwater River Watershed; with the potential of an additional five to ten more projects, based on data analysis obtained from a number of models.

Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Recipient
Red Lake SWCD
2011 Fiscal Year Funding Amount
$102,895
Fund Source

Gullies are a fixture of the landscape. Except for avoiding them during field work they can be ignored for years and the benefits to the landowner of fixing them never seem to outweigh the costs for doing so. It is only when viewed over time that the true impact becomes apparent. Red Lake County SWCD identified these two project locations as high priority due to the large amount of sediment these projects have contributed to the Red Lake River. Those impacts will continue as the erosion accelerates and they become deeper and wider over time.

Recipient
Red Lake County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$120,000
Fund Source

Installation of erosion control structures to eliminate or reduce the effects of gullies is a high priority due to the large amount of sediment they have contributed to the Red Lake River. The high sediment loading is affecting water quality, aquatic life, downstream water supply sources and recreational use of the Red Lake River.

Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$187,974
Fund Source

The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.

Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$187,974
Fund Source

The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.

Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$662,000
Fund Source

In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.

Recipient
Red Lake County SWCD
2011 Fiscal Year Funding Amount
$26,456
Fund Source

The Clean Water Fund Project's primary purpose is to reduce soil loss, eliminate sediment deposition in the two Red Lake Watershed District(RLWD) ditch systems, improve water quality, and reduce maintenance costs along these ditch systems. The project will be a team effort between the Red Lake County SWCD, the Red Lake Watershed District, and the landowners located along the ditch systems.

Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Recipient
Red Lake WD
2015 Fiscal Year Funding Amount
$38,700
Fund Source

The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.

Recipient
Red Lake County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$36,000
Fund Source

This project is a continuation project of a successful 2011 Clean Water Fund project. The primary purpose of the project is to reduce soil loss from fields and improve the water quality of Red Lake Watershed District Ditch #3. This project will eliminate sediment deposition and reduce maintenance costs along the ditch system by installing 15 sidewater inlets. The project is a team effort with the Red Lake Watershed District and the landowners located along the ditch system.

Recipient
Red Lake County SWCD
2013 Fiscal Year Funding Amount
$40,400
Fund Source

Stormwater along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.

Recipient
Red Lake SWCD
2011 Fiscal Year Funding Amount
$48,421
Fund Source

Erosion from streambanks and fields along the Clearwater River add sediment, nutrients and organic material to this important tributary of the Red River of the North. Turbidity impairments caused by those sediments contribute to several environmental and economic problems including interfering with spawning habitat critical to Lake Sturgeon recovery in the Red River Watershed and increasing drinking water treatment costs for the city of East Grand Forks.