All Projects

Showing 1 - 32 of 32 | Export projects
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

2018 Fiscal Year Funding Amount
$613,201
2017 Fiscal Year Funding Amount
$736,809
2016 Fiscal Year Funding Amount
$640,271
2015 Fiscal Year Funding Amount
$711,218
2014 Fiscal Year Funding Amount
$732,000
2013 Fiscal Year Funding Amount
$393,000
2012 Fiscal Year Funding Amount
$412,250
Fund Source

“Acquiring Land and Creating Opportunities - A Parks and Trails Strategic Objective” is a program area representing DNR’s commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to ‘create new and expanded park and trail opportunities to satisfy current customers as well as to reach out to new ones’.The purpose of this program is to call attention to the pillar, but also to centralize and streamline reporting on other related programs within the pillar.

2013 Fiscal Year Funding Amount
$214,000
2012 Fiscal Year Funding Amount
$239,000
Fund Source

Strategic planning efforts guide the expenditure of Legacy funds towards desired outcomes which are derived from public and stakeholder input, research, analysis and input from a variety of experts and leadership. Parks and Trails planners conduct these efforts. Staffing levels were adjusted to complete this legacy work. Legacy funds have also substantially increased the numbers of projects completed each year. Design and project management levels of work have increased correspondingly. Conservation Corps of Minnesota and Parks and Trails staff conduct these efforts.

2018 Fiscal Year Funding Amount
$1,375,000
2017 Fiscal Year Funding Amount
$1,375,000
2016 Fiscal Year Funding Amount
$1,375,000
2015 Fiscal Year Funding Amount
$1,375,000
2014 Fiscal Year Funding Amount
$1,375,000
2013 Fiscal Year Funding Amount
$1,500,000
2012 Fiscal Year Funding Amount
$1,500,000
2011 Fiscal Year Funding Amount
$525,000
2010 Fiscal Year Funding Amount
$600,000
Fund Source

The DNR is working with local communities and an interagency team to define, prioritize, and establish groundwater management areas in Minnesota. Groundwater management areas will have increased data collection and monitoring that allow the state and local communities to understand water supplies, uses, limitations, and threats to natural resources that depend on groundwater. This information will support detailed aquifer protection plans that ensure equitable and sustainable groundwater and drinking water use for the future.

2018 Fiscal Year Funding Amount
$100,000
2017 Fiscal Year Funding Amount
$325,000
2016 Fiscal Year Funding Amount
$325,000
Fund Source

Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers.The DNR's role in Minnesota's new buffer law is to produce a statewide map of public waters and public ditches that require permanent vegetation buffers. The DNR is scheduled to produce these maps by July 2016.

2018 Fiscal Year Funding Amount
$433,189
2017 Fiscal Year Funding Amount
$311,005
2016 Fiscal Year Funding Amount
$493,555
2015 Fiscal Year Funding Amount
$266,707
2014 Fiscal Year Funding Amount
$274,500
2013 Fiscal Year Funding Amount
$182,750
2012 Fiscal Year Funding Amount
$182,750
Fund Source

“Connecting People to the Outdoors- A Parks and Trails Strategic Objective” is a program area representing DNR’s commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to ‘better develop Minnesota’s stewards of tomorrow through efforts to increase life-long participation in parks and trails.’The purpose of this program is to call attention to the pillar, but also to centralize and streamline reporting on other related programs within the pillar.

2012 Fiscal Year Funding Amount
$0
2010 Fiscal Year Funding Amount
$0
Fund Source

The Division of Parks and Trails (as directed by Chapter 172, Art. 3, Sec. 2, Subd. 3(c)) utilizes Conservation Corps of Minnesota services for restoration, maintenance, and other activities that supplement the ability to reach Legacy Fund goals. Budget associated with this program area capture an accounting of dollars that support CCM Summer Youth, Individual Placements, and special projects for park and trail renewal and development. Other dollars not accounted for in this program area are part of other PAT program areas and included as part of those budgets.

2018 Fiscal Year Funding Amount
$371,000
2017 Fiscal Year Funding Amount
$355,000
2016 Fiscal Year Funding Amount
$310,000
2013 Fiscal Year Funding Amount
$17,000
2012 Fiscal Year Funding Amount
$17,000
Fund Source

“Coordinating with Partners- A Parks and Trails Strategic Objective” is a program area representing DNR’s commitment to one of the four pillars identified in the 25 year Legacy plan.

Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

2018 Fiscal Year Funding Amount
$125,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$615,000
2014 Fiscal Year Funding Amount
$615,000
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$0
2011 Fiscal Year Funding Amount
$0
2010 Fiscal Year Funding Amount
$1,000,000
Fund Source

The DNR works with the Minnesota Geological Survey (MGS) to develop County Geologic Atlases to convey geologic and hydrogeologic (groundwater) information and interpretations to government units at all levels, but particularly to local governments, as well as private organizations and citizens. The MGS focuses on geology (Part A reports) and DNR focuses on groundwater (Part B reports).These studies provide information about the region’s geology and groundwater’s presence, direction of flow, natural quality, age, and pollution sensitivity.

Recipient
Vermillion River Watershed Joint Powers Organization (Fiscal Agent: Dakota County)
2012 Fiscal Year Funding Amount
$189,170
Fund Source

This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.

Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

2018 Fiscal Year Funding Amount
$135,000
2017 Fiscal Year Funding Amount
$135,000
2016 Fiscal Year Funding Amount
$135,000
2015 Fiscal Year Funding Amount
$135,000
2014 Fiscal Year Funding Amount
$135,000
2013 Fiscal Year Funding Amount
$130,000
2012 Fiscal Year Funding Amount
$130,000
2011 Fiscal Year Funding Amount
$132,000
2010 Fiscal Year Funding Amount
$130,000
Fund Source

The DNR works with the Minnesota Pollution Control Agency and the Minnesota Department of Health to determine the level of contamination from mercury and other harmful chemicals in fish from Minnesota's lakes and rivers and to track the success of efforts to reduce mercury pollution. Clean Water Legacy funding is being used to significantly increase (more than double) the number of lakes and rivers that are assessed for mercury contamination on an annual basis. Fish are collected during DNR fishery surveys, processed for laboratory testing, and analyzed for contaminants.

Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

2018 Fiscal Year Funding Amount
$1,406,456
2017 Fiscal Year Funding Amount
$1,456,863
2016 Fiscal Year Funding Amount
$1,438,933
2015 Fiscal Year Funding Amount
$803,121
2014 Fiscal Year Funding Amount
$823,500
2013 Fiscal Year Funding Amount
$570,000
2012 Fiscal Year Funding Amount
$595,000
Fund Source

“Maintaining Existing Holdings - A Parks and Trails Strategic Objective” is a program area representing DNR’s commitment to one of the four pillars identified in the 25 year Legacy plan.

2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Recipient
University of Minnesota
2010 Fiscal Year Funding Amount
$250,000

Native trout require clean, cold water that usually originates from springs, but the springs feeding the 173 designated trout streams in southeastern Minnesota are under increasing pressure from current and expected changes in land use. This joint effort by the University of Minnesota and the Minnesota Department of Natural Resources is working to identify and map the springs and the areas that feed water to these springs and to learn how these waters might be affected by development and water use.

Recipient
MN DNR
2010 Fiscal Year Funding Amount
$250,000

Native trout require clean, cold water that usually originates from springs, but the springs feeding the 173 designated trout streams in southeastern Minnesota are under increasing pressure from current and expected changes in land use. This joint effort by the University of Minnesota and the Minnesota Department of Natural Resources is working to identify and map the springs and the areas that feed water to these springs and to learn how these waters might be affected by development and water use.

Recipient
Zumbro Watershed Partnership
2012 Fiscal Year Funding Amount
$76,360
Fund Source

The Zumbro River Watershed is a major watershed in the Lower Mississippi River basin in SE Minnesota. It includes parts of six counties, covering 910,291 acres. This project will assess all 13 stream reaches in the Zumbro River Watershed to determine if they are meeting their designated uses. The monitoring will entail collecting water chemistry and field parameters.

Recipient
MN DNR
2012 Fiscal Year Funding Amount
$110,000
2013 Fiscal Year Funding Amount
$110,000

PROJECT OVERVIEW

Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$140,000
2013 Fiscal Year Funding Amount
$140,000

PROJECT OVERVIEW

Recipient
DNR
2011 Fiscal Year Funding Amount
$1,100,000

PROJECT OVERVIEW

2018 Fiscal Year Funding Amount
$318,967
2017 Fiscal Year Funding Amount
$301,962
2016 Fiscal Year Funding Amount
$316,000
2015 Fiscal Year Funding Amount
$258,755
2014 Fiscal Year Funding Amount
$100,000
2013 Fiscal Year Funding Amount
$100,000
2012 Fiscal Year Funding Amount
$100,000
2011 Fiscal Year Funding Amount
$118,000
Fund Source

The Watershed Health Assessment Framework is a web-based tool for resource managers and others interested in the ecological health of Minnesota’s watersheds. The framework uses five ecological components to organize and deliver information about watershed health conditions in Minnesota. The five components are: hydrology, connectivity, biology, geomorphology, and water quality. The WHAF website strives to make complex issues easier to visualize. An interactive map delivers 27 health scores organized by the five components.

2018 Fiscal Year Funding Amount
$248,238
2017 Fiscal Year Funding Amount
$223,000
2016 Fiscal Year Funding Amount
$223,000
2015 Fiscal Year Funding Amount
$190,000
2014 Fiscal Year Funding Amount
$190,000
2013 Fiscal Year Funding Amount
$235,000
2012 Fiscal Year Funding Amount
$235,000
2011 Fiscal Year Funding Amount
$190,000
2010 Fiscal Year Funding Amount
$180,000
Fund Source

This project delineates and maps watersheds (drainage areas) of lakes, rivers, streams, and wetlands for the state of Minnesota and provides watershed maps in digital form for use in geographic information systems. These maps become the basis for clean water planning and implementation efforts.

2018 Fiscal Year Funding Amount
$1,567,033
2017 Fiscal Year Funding Amount
$1,940,000
2016 Fiscal Year Funding Amount
$1,624,000
2015 Fiscal Year Funding Amount
$1,591,245
2014 Fiscal Year Funding Amount
$1,750,000
2013 Fiscal Year Funding Amount
$1,630,000
2012 Fiscal Year Funding Amount
$1,630,000
2011 Fiscal Year Funding Amount
$1,182,500
2010 Fiscal Year Funding Amount
$689,000
Fund Source

The DNR's Regional Clean Water Specialists and Area Hydrologists work with other state agencies and local partners to help identify the causes of pollution problems and determine the best strategies for fixing them. A statewide coordinator works with the DNR and external partners to ensure funds are spent in the most effective and efficient manner to meet the State's clean water goals.

2018 Fiscal Year Funding Amount
$176,762
2017 Fiscal Year Funding Amount
$202,000
2016 Fiscal Year Funding Amount
$202,000
2015 Fiscal Year Funding Amount
$185,000
2014 Fiscal Year Funding Amount
$185,000
2013 Fiscal Year Funding Amount
$230,000
2012 Fiscal Year Funding Amount
$230,000
2011 Fiscal Year Funding Amount
$95,000
2010 Fiscal Year Funding Amount
$85,000
Fund Source

The DNR provides technical support to watershed managers and landowners regarding drainage issues. Drainage experts are using a state of the art computer model to look at cumulative impacts of drainage and land-use practices and determine the benefits of site-specific best management practice. This work is with multiple partners and at multiple scales.

Recipient
Zumbro Watershed Partnership
2012 Fiscal Year Funding Amount
$75,000
2013 Fiscal Year Funding Amount
$75,000

OVERALL PROJECT OUTCOME AND RESULTS
This project identified and prioritized areas in the Zumbro River Watershed that were determined critical for restoring and protecting water quality. Studies suggested that small areas of the landscape contribute disproportionately to nonpoint source pollution. So implementation of conservation projects that focus on those areas will maximize water quality benefits and ensure efficient use of resources.

Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.