All Projects

Showing 1 - 40 of 46 | Export projects
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Recipient
Becker SWCD
2014 Fiscal Year Funding Amount
$40,710
Fund Source

The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.

Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Recipient
Becker SWCD
2018 Fiscal Year Funding Amount
$398,000
Fund Source
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Recipient
Minnesota Department of Agriculture
2017 Fiscal Year Funding Amount
$13,578
2016 Fiscal Year Funding Amount
$10,048
2015 Fiscal Year Funding Amount
$7,042
2014 Fiscal Year Funding Amount
$13,000
2013 Fiscal Year Funding Amount
$14,400
2012 Fiscal Year Funding Amount
$31,400
2010 Fiscal Year Funding Amount
$60,000
Fund Source

The Clay County Drainage Site is designed to evaluate the environmental impact of both surface and subsurface drainage from agricultural fields. This site includes six subsurface plots and one surface runoff plot, each approximately 24 acres in size. Monitoring stations are fully automated and each individual plot is monitored separately.The soils and topography across this demonstration site are virtually identical and represent field characteristics common in the most productive agricultural areas of the Red River Valley.

Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$105,408
Fund Source

A partnership of local, state and federal organizations has used multiple funding sources to target nonpoint pollution reduction efforts to the Hay Creek Watershed, a 24-square-mile area in Becker County that features several high- quality lakes. Clean Water Legacy grants were received in 2008 by the Buffalo-Red River Watershed District and in 2011 by the Becker SWCD. The grants leveraged both local and federal dollars, and it built on previous efforts to identify locations where conservation projects could provide the greatest benefits for water quality and wildlife habitat.

Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Recipient
Wilkin SWCD
2018 Fiscal Year Funding Amount
$185,000
Fund Source
Recipient
Minnesota Department of Agriculture and Multiple local partners
2019 Fiscal Year Funding Amount
$3,000,000
2018 Fiscal Year Funding Amount
$2,000,000
2017 Fiscal Year Funding Amount
$2,500,000
2016 Fiscal Year Funding Amount
$2,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2014 Fiscal Year Funding Amount
$1,500,000
2013 Fiscal Year Funding Amount
$132,830
2012 Fiscal Year Funding Amount
$173,380
Fund Source

The Minnesota Ag Water Quality Certification Program (MAWQCP) is a voluntary opportunity for farmers and agricultural landowners to take the lead on implementing conservation practices that protect water quality. Those who implement and maintain approved conservation practices will be certified and in turn obtain regulatory certainty for a period of ten years. This program will help address concerns about changing regulatory requirements from multiple state and federal agencies.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$203,000
Fund Source

The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.

Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$135,000
Fund Source

This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.

Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$16,225
Fund Source

The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.

Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$201,000
Fund Source

The Otter Tail River is impaired for turbidity. This project involves the installation of 45 side-inlet structures into Wilkin County Ditch 3-2 and 7-1 and 22 acres of buffer strips along the entire systems. Eleven miles of continuous berm will also be constructed along the ditch. When installed these water quality practices will become a permanent part of the ditch system and will be maintained by the ditch authority. These ditches outlet to the Otter Tail River just upstream from Breckenridge, MN. Together these water quality BMPs will reduce sediment loading by 1,375 tons/year.

Recipient
University of Minnesota: Sponsored Projects Administration
2015 Fiscal Year Funding Amount
$80,322
Fund Source

This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$272,267
2014 Fiscal Year Funding Amount
$359,367
Fund Source

International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.

Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Recipient
US Geological Survey
2017 Fiscal Year Funding Amount
$12,520
Fund Source

The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.

Recipient
Becker County
2016 Fiscal Year Funding Amount
$75,000
Fund Source

An effective regulatory program is key to the successful implementation of local land use and water management plans. Yet, county, watershed, and other state, tribal, and local agencies charged with enforcement and permit review often work in silos and infrequently coordinate with each other or share information. This leads to higher enforcement costs, conflicts between agencies, redundancy of inspections, property owner frustration, and reinforces negative stereotypes of regulatory agencies.