All Projects

Showing 1 - 17 of 17 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Recipient
Vermillion River Watershed Joint Powers Organization (Fiscal Agent: Dakota County)
2012 Fiscal Year Funding Amount
$189,170
Fund Source

This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.

Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$139,450
Fund Source

The MPCA, in partnership with the Vermillion River Watershed Joint Powers Organization, contracted with Wenck Associates, Inc., to develop the Stressor Identification (SID) Report; and develop the necessary models for the Vermillion River Watershed Restoration and Protection Strategies (WRAPS) as part of Phase I. The final Vermillion River Watershed SID report discusses all of the analysis that was done in the watershed to identify the primary stressors causing the fish and macroinvertebrate impairments in the watershed.

Recipient
City of Inver Grove Heights
2013 Fiscal Year Funding Amount
$75,991
Fund Source

The City of Inver Grove Heights will remove PAH contaminated sediment from the 79th Street Pond. Approximately 2,300 cubic yards of sediment will be dredged and disposed of at the Pine Bend Landfill located in the City of Inver Grove Heights.

Recipient
City of Waconia
2013 Fiscal Year Funding Amount
$26,000
Fund Source

The City of Waconia will implement its 2012-13 Storm Pond Cleaning Project and 2012 Improvement Project which includes removal and disposal of more than 2,200 cubic yards of PAH contaminated sediment from 3 stormwater ponds. The contaminated sediment will be disposed of in the Waste Management industrial landfill located in Burnsville, MN.

Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$90,980
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program – FORTRAN (HSPF) watershed model for a portion of the Mississippi River-Lake Pepin watershed.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Recipient
Saint Cloud, City of
2014 Fiscal Year Funding Amount
$35,507
Fund Source

The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.

Recipient
LimnoTech
2012 Fiscal Year Funding Amount
$3,810
2011 Fiscal Year Funding Amount
$46,430
Fund Source

This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.

Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Recipient
Vermillion River Watershed Joint Powers Organization
2014 Fiscal Year Funding Amount
$78,779
Fund Source

The VRWJPO is pursuing a Watershed Restoration and Protection Strategy (WRAPS) project in cooperation with the MPCA in order to better identify the sources of stress and impairment to the river, tributaries, and lakes and evaluate the feasibility of reaching water quality goals, and properly allocating pollution reduction goals to those areas identified as likely pollution sources. Successful restoration and protection outcomes are dependent on successful community building and ownership of both the problems and solutions identified in the WRAPS.

Recipient
Wenck Associates, Inc.
2014 Fiscal Year Funding Amount
$147,761
Fund Source

The goal is to develop the Watershed Restoration and Protection Strategy (WRAPS) and a public and stakeholder participation process that encourages local involvement in water quality discussions and solutions, identifying impaired waters, developing Total Maximum Daily Loads (TMDLs); and planning, setting priorities, and implementing the WRAPS recommendation to restore impaired waters. Phase II of the WRAPS will consists of developing TMDLs for the impaired reaches as well as developing the final WRAPS document and implementation planning.