All Projects

Showing 1 - 40 of 97 | Export projects
Recipient
Bois de Sioux WD
2017 Fiscal Year Funding Amount
$135,000
Fund Source

Through the Mustinka River Watershed Restoration and Protection Strategy high priority locations have been identified as critical areas to reduce sediment from agricultural fields. The goal of this project is to target one of the areas that is of high concern, the watershed of Traverse County Ditch 37. This effort intends to begin a program to install side inlets and erosion control berms along the ditch with the goal of reducing the sediment load by 340 tons of sediment per year.

Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$300,000
Fund Source

This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.

Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$100,000
Fund Source

This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.

Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$131,200
Fund Source

Lower Prior Lake was the target of a 2011-2013 diagnostic and feasibility study that identified projects and ranked subwatershed by phosphorus loading to the lake. This project is in a high loading subwatershed and includes three elements designed to reduce phosphorus loading and control rates and volumes of stormwater runoff: 1) retrofitting an existing ditch section with in-line iron-sand filters; 2) expanding storage capacity and creating wetland upstream of the ditch; and 3) installing a new control structure in an existing berm.

Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source
Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$58,000
Fund Source

Arctic Lake, while not listed as an impaired water on the statewide 303(d) list, both regularly exceeds the statewide phosphorus standard for shallow lakes and drains directly to Upper Prior Lake, which is impaired for nutrients Reducing Phosphorus to Arctic Lake will help reverse the current declining water quality while also reducing the loading entering Upper Prior Lake.

Recipient
Dakota SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.

Recipient
Bloomington, City of
2016 Fiscal Year Funding Amount
$50,000
Fund Source

This project proposes significant improvements to the City of Bloomington's Anti-Icing/Brine making capabilities. The use of anti-icing technology reduces the amount of salt needed to clear snow and ice from city street. The improvements work to address the chloride impairment in Nine Mile Creek and the metro area by reducing the amount of salt applied to the streets and thereby reducing the amount of chlorides entering our surface water systems.

Recipient
Scott SWCD
2017 Fiscal Year Funding Amount
$201,000
Fund Source

This project builds on the momentum and success of previous Clean Water Fund grants in making significant non-point source pollution reductions that address state-identified turbidity, excess nutrient and dissolved oxygen impairments of the Lower Minnesota River and points downstream. These water quality improvements will be achieved by constructing high-value, cost-effective conservation best management practices in Scott County directly tributary to the Minnesota River.

Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Recipient
Carver County
2014 Fiscal Year Funding Amount
$40,000
Fund Source

Recent efforts by Carver County Water Management Organization Staff have centered on removing point sources of bacteria in both Bevens and Carver Creeks. These efforts have shown improvement in water quality; however the creeks are still above the state standard for E. coli. Early results from field surveys have pinpointed areas where livestock have uncontrolled access to streams. Five sites over a twenty mile stretch of Bevens Creek have shown evidence of livestock access to streams and associated damage to streambanks.

Recipient
Sibley County
2010 Fiscal Year Funding Amount
$9,770
Fund Source

This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.

Recipient
Riley-Purgatory-Bluff Creek WD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

In 2002 and 2004, the Minnesota Pollution Control Agency listed Bluff Creek for turbidity and biological integrity. A Total Maximum Daily Load report and implementation plan were finalized and approved in 2013. This project was identified as a high priority site for culvert restoration and bank repairs.

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Recipient
Bois de Sioux Watershed District
2011 Fiscal Year Funding Amount
$150,000
Fund Source

This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.

Recipient
Carver County
2014 Fiscal Year Funding Amount
$200,000
Fund Source

The Burandt Lake Stormwater Reuse System (BLSRS) project will install a water reuse system to capture untreated storm water and reduce pollutants entering Burandt Lake. This collaborative project with Carver County, Carver County Soil and Water Conservation District (SWCD), City of Waconia and Independent School District 110 will retain and reuse an estimated 48% of the annual storm water runoff (1.25 million gallons) currently generated from eight acres of adjacent residential neighborhoods.

Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Recipient
Carver County
2014 Fiscal Year Funding Amount
$150,000
Fund Source

This project will increase the ability of the Carver County Water Management Organization (CCWMO) to approach local community partners and fund projects that treat stormwater runoff at the source instead of treating stormwater downstream at a regional pond or through other large scale best management practices (BMPs).

Recipient
Carver County
2017 Fiscal Year Funding Amount
$10,000
Fund Source

The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.

Recipient
Carver County
2014 Fiscal Year Funding Amount
$11,307
Fund Source

Carver County Staff will monitor Silver Creek at station S000-843 following the basic monitoring regime. S000-843 is located in the Lower Minnesota subwatershed in southeastern Carver County. The monitoring will be conducted from 2014 to 2015 and include 13 site visits in 2014; collecting TSVS, TSS, Total P, Ammonia-N, TKN, NO2+NO3, Sulfate, Chloride, and Hardness as CaCO3 ten times. E.coli will be collected nine times in 2014.

Recipient
Minnetonka, City of
2014 Fiscal Year Funding Amount
$129,200
Fund Source

The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.

Recipient
Carver SWCD
2017 Fiscal Year Funding Amount
$120,935
Fund Source

The purpose of this project is to install prioritized and targeted best management practices on the Carver County Ditch #6 drainage system that drains directly into Bevens Creek. Bevens Creek does not meet state water quality standards for sediment. The goal of the project is to install 6 grade stabilization structures, 5 grassed waterways, and 2 water and sediment control basins that have been identified through GIS LIDAR applications and field verified along with landowner support.

Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Recipient
Hawk Creek Watershed Project
2013 Fiscal Year Funding Amount
$10,000
Fund Source

This project will upgrade an estimated 75 subsurface sewage treatment systems (SSTS) for the three counties of Chippewa, Kandiyohi, and Renville within the watershed. The grant funds will be used to administer the loan program for the three counties.

Recipient
Carver County WMO
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Carver County has identified water quality improvement of Carver, Bevens and Silver Creek as a water management priority. This project will identify storage or wetland restoration sites that are highly effective at reducing pollutant loading to downstream impaired waters using high-resolution Light Detection and Ranging (LiDAR) data and Geographic Information System (GIS) processes. The watershed landscape has been highly modified for agricultural production land development; less than 50 percent of pre-settlement wetland acres remain in Carver County.

Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$48,000
Fund Source

The downtown Chanhassen stormwater best management practice (BMP) retrofit assessment project will reduce watershed phosphorus loads to Rice Marsh Lake and improve the water quality in downstream Lake Riley, impaired for excess nutrients. This project will identify innovative BMP retrofit opportunities that target soluble phosphorus and promote infiltration and groundwater recharge within this highly-developed area. The downtown Chanhassen BMP retrofit assessment project will be performed in partnership with the City of Chanhassen.

Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$135,000
Fund Source

This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Recipient
Burnsville, City of
2016 Fiscal Year Funding Amount
$398,000
Fund Source

The Keller Lake Water Quality Improvement Project achieves the goals of the City of Burnsville, Black Dog Watershed Management Organization, and the Keller Lake TMDL by:-Achieving the City of Burnsville phosphorus removal requirement outlined in the Keller Lake TMDL by removing 78 lbs/yr-Utilizing remaining available land to construct a high performance, regional stormwater BMP-Providing a high profile water resource/stormwater educational opportunity in the frequently visited Crystal Beach Park-Retaining valuable open space in popular Crystal Beach Park by constructing the BMP undergroundK

Recipient
Apple Valley, City of
2017 Fiscal Year Funding Amount
$30,000
Fund Source

The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.