All Projects

Showing 1 - 40 of 1351 | Export projects
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$55,602
Fund Source

The goal of this project is to assess water quality in the following Anoka County waterbodies: Minard Lake, Pickerel Lake, Trott Brook, Seelye Brook, Cedar Creek, and the Rum River.

Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Recipient
Lake County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$25,930
Fund Source

The primary goal of this project is to accurately collect surface water quality data to help support the MPCA’s Intensive Watershed Monitoring efforts in the Lake Superior North Watershed.

Recipient
Redwood-Cottonwood Rivers Control Area Joint Powers Board
2013 Fiscal Year Funding Amount
$17,714
Fund Source

The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.

Recipient
Clearwater Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$10,519
Fund Source

The goal of this project is to establish data sets to evaluate the Aquatic Recreational Use of Mallard, Sucker, and Ozawindib Lakes in southeastern Clearwater County.

Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Recipient
Hawk Creek Watershed Project
2013 Fiscal Year Funding Amount
$99,217
Fund Source

This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).

Recipient
Wilkin SWCD
2014 Fiscal Year Funding Amount
$165,000
Fund Source

The Red River is impaired for sediment. This project will install best management practices to repair severe gullies that are contributing massive sediment loads to the Red River. The City of Moorhead also draws water from the Red River for its drinking water supply downstream. The proposed practices will reduce water treatment costs upon installation. Grant funds will be used to install four grade stabilization structures. These structures will control concentrated runoff and reduce flow velocities.

Recipient
Winona SWCD
2014 Fiscal Year Funding Amount
$275,539
Fund Source

The Winona County Soil and Water Conservation District (SWCD) developed this project to help reduce the amount of pathogens and nutrients generated by livestock from reaching surface waters and groundwater by targeting feedlots located in areas that are highly susceptible to groundwater pollution and sinkhole formation.

Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$131,200
Fund Source

Lower Prior Lake was the target of a 2011-2013 diagnostic and feasibility study that identified projects and ranked subwatershed by phosphorus loading to the lake. This project is in a high loading subwatershed and includes three elements designed to reduce phosphorus loading and control rates and volumes of stormwater runoff: 1) retrofitting an existing ditch section with in-line iron-sand filters; 2) expanding storage capacity and creating wetland upstream of the ditch; and 3) installing a new control structure in an existing berm.

Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$58,000
Fund Source

Arctic Lake, while not listed as an impaired water on the statewide 303(d) list, both regularly exceeds the statewide phosphorus standard for shallow lakes and drains directly to Upper Prior Lake, which is impaired for nutrients Reducing Phosphorus to Arctic Lake will help reverse the current declining water quality while also reducing the loading entering Upper Prior Lake.

Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

The Chisago Soil and Water Conservation District has been successful in implementing Best Management Practices in certain targeted locations within the county, including the prioritized and assessed areas of Chisago City, Lindstrom, and Center City. However, there are many areas that want to implement conservation projects but aren't within targeted areas. This award will empower community partners, especially lake associations, to award grants for rain gardens, shoreline buffers, and other worthwhile projects to improve water quality.

Recipient
Faribault County SWCD
2015 Fiscal Year Funding Amount
$110,000
Fund Source

The Faribault Soil and Water Conservation District will provide mini-grants to conservation-conscious community organizations who voluntarily construct best management practices that provide storage and treatment of stormwater runoff at its source.

Recipient
Nobles SWCD
2015 Fiscal Year Funding Amount
$264,700
Fund Source

The Targeted Bacterial Impairment Reduction Project will reduce bacterial loading by 87% on the Elk Creek Tributary a priority site on the Rock River.

Recipient
Itasca SWCD
2016 Fiscal Year Funding Amount
$141,000
Fund Source

This project is the first step toward a regional based implementation approach to reduce phosphorus and total suspended solids in the 12 cities on the Mississippi River. By the time this project is approved, a stormwater retrofit analysis will be completed for the cities, and the MHB will be discussing with them a strategic way to implement the study on a regional scale. By funding this project, you are encouraging the future implementation in a strategic and organized process.

Recipient
Chisago SWCD
2016 Fiscal Year Funding Amount
$220,500
Fund Source

The Chisago Soil and Water Conservation District (SWCD) has had such great success implementing gully stabilization projects along the St. Croix River escarpment that all of the current grant funding has been encumbered towards projects. Two large gully projects, one in the City of Taylors Falls and a second nearby in Interstate State Park, are lined up and ready to go as soon as funding is secured. Both of these gullies are large and have been actively eroding for many years, depositing large loads of sediment and phosphorus directly into the St. Croix River.

Recipient
Bloomington, City of
2016 Fiscal Year Funding Amount
$50,000
Fund Source

This project proposes significant improvements to the City of Bloomington's Anti-Icing/Brine making capabilities. The use of anti-icing technology reduces the amount of salt needed to clear snow and ice from city street. The improvements work to address the chloride impairment in Nine Mile Creek and the metro area by reducing the amount of salt applied to the streets and thereby reducing the amount of chlorides entering our surface water systems.

2018 Fiscal Year Funding Amount
$200,000

$200,000 the first year is to the city of St. Peter to reconstruct the Minnesota Square Park pavilion in St. Peter.

Recipient
Wadena Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$145,000
Fund Source

Most of Hubbard, Todd and Wadena Counties' irrigated acreage consists of highly permeable, low water holding capacity, sandy textured soils overlying shallow and buried sand and gravel aquifers. These aquifers are very susceptible to non-point water quality degradation from land use practices.

Recipient
City of Hinckley
2018 Fiscal Year Funding Amount
$12,900

ACHF Grant for Organizations

Recipient
City of Mora
2018 Fiscal Year Funding Amount
$7,133

ACHF Grant for Organizations

Recipient
City of North Branch
2018 Fiscal Year Funding Amount
$5,022

ACHF Grant for Organizations

Recipient
City of Milaca AKA Milaca Parks Commission
2012 Fiscal Year Funding Amount
$14,920
Rec Fest 2012
Recipient
City of Royalton
2014 Fiscal Year Funding Amount
$4,695
To purchase microfilm reader/printer to broaden public accessibility to primary records.
Recipient
Afton, City of
2011 Fiscal Year Funding Amount
$19,836
Fund Source

Evaluate alternatives to fix failing subsurface sewage treatment systems

Recipient
Marshall County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$178,750
Fund Source

The Thief River and its tributaries have deteriorating water quality due to sedimentation. Sediment plumes and deltas have formed at the inlets of pools in Agassiz National Wildlife Refuge (Agassiz Pool) and Thief Lake, an important recreational resource in Northwest Minnesota.

Recipient
Dakota County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$150,000
Fund Source

This project will improve surface and groundwater quality in the rural sections of the Vermillion and North Cannon River Watersheds located in Dakota County through the installation of targeted structural and vegetative conservation practices. This project will leverage local and federal funds to provide technical and financial assistance to landowners that install agricultural water quality practices.

Recipient
Aitkin County Soil & Water
2013 Fiscal Year Funding Amount
$35,475
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Aitkin County Lakes and Rivers Association, Lake Associations, as well as other eligible community partners to reduce the impacts of stormwater runoff and keep water on the land. A mini-grant program to install rain gardens and native vegetation buffers along shorelines of lakes with a completed "Lake Assessment" supported by previous BWSR funding or a TMDL Implementation Plan will be implemented.

Recipient
Grass Lake Watershed Management Organization
2010 Fiscal Year Funding Amount
$32,000
Fund Source

At 410 acres, Lake Owasso is the largest lake in the Grass Lake Water Management Organization (GLWMO) and one of the most pristine. Maintaining the lakes water quality is a priority for the GLWMO. A long urbanized area along Aladdin Street in Roseville currently lacks stormwater features to remove pollutants and reduce water volume. The rainwater from this area drains directly to a wetland which is hydrologically connected to Lake Owasso. Adjacent to the residential area is a 0.5 acre parking lot which drains into a ditch which eventually enters the same wetland.

Recipient
Shell Rock River Watershed District
2015 Fiscal Year Funding Amount
$700,000
2014 Fiscal Year Funding Amount
$1,127,000
Fund Source

The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.

Recipient
Clearwater Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$8,000
Fund Source

Clearwater County's lakes provide significant environmental, economic and recreational benefits . This project will assist local water management planning efforts by collecting and analyzing available lake water quality information and watershed characteristics for Bagley, Long Lake and Long Lost Lakes. Bringing the available water quality information that has been gathered and presenting it in a manner that is understandable to lake residents and other citizens is the goal of the project.

Recipient
Amador Township
2011 Fiscal Year Funding Amount
$25,500
Fund Source

Evaluate alternatives to fix failing subsurface sewage treatment systems

Recipient
Benton SWCD
2010 Fiscal Year Funding Amount
$16,500
Fund Source

This project continues water plan activities from a 2007 Clean Water Legacy grant and initiates a multi-county project to restore hydrology and water quality in an impaired trout stream.The first goal of this project is to reduce the impacts of animal manure and fertilizer on surface and groundwater by installing low cost feedlot improvements and targeted manure management planning.

Recipient
Kanabec County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$112,265
2013 Fiscal Year Funding Amount
$2,000
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.

Recipient
Anoka Conservation District
2010 Fiscal Year Funding Amount
$400,000
Fund Source

A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).

Recipient
Anoka Conservation District
2011 Fiscal Year Funding Amount
$600,000
Fund Source

A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.

Recipient
St. Anthony - Stormwater
2014 Fiscal Year Funding Amount
$247,442
Fund Source

Construct stormwater BMPs to meet TMDL wasteload allocation

Recipient
Arlington, City of
2011 Fiscal Year Funding Amount
$640,339
Fund Source

Construct treatment plant improvements