All Projects

Showing 1 - 26 of 26 | Export projects
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$86,020
Fund Source

Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.

Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$36,342
Fund Source

This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$39,121
Fund Source

The goal of this project is to supplement and refine the Deer Creek Watershed TMDL Report and Implementation Plan project with detailed determinations of critical source areas and prioritization of the associated management practices, facilitated by additional meetings with local resource managers and validated with a field survey. Completed work will more fully inform the TMDL report and TMDL implementation plan on critical source areas of sediment and quantify those sources.

Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Recipient
Tetra Tech
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to finalize HSPF watershed models for the St. Louis, Cloquet, and Nemadji Rivers.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$110,000
Fund Source

Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.

Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$199,999
Fund Source
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$160,000
Fund Source

This project is to complete the Watershed Restoration and Protection (WRAP) process, complete Total Maximum Daily Load (TMDL) reports and calculations, develop and discuss Hydrological Simulation Program FORTRAN (HSPF) model scenarios, set restoration and protection priorities, and integrate all of this information in the final WRAPS report.

Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$53,465
Fund Source

This project will define the major factors causing harm to fish and other river and stream life within the Nemadji watershed. Stressor identification is a formal and rigorous process to identify these factors, explain the linkages between the results of biological monitoring and water quality assessments, and organize this information into a structure of scientific evidence that supports the conclusions of the process. Stressor identification is a component of the Watershed Restoration and protection (WRAP) approach.

Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$99,973
Fund Source
The goal of this workplan is to define the major factors causing harm to fish and other river and stream life within the Nemadji Watershed. The work will complete the strength of evidence tables, will explain the linkages between biological monitoring results and water quality assessments, and will organize this information into a scientific evidence structure that supports the conclusions of the overall process. Multiple lines of evidence are reviewed and evaluated to produce a final evaluative report. This work order, the second of two, begins in 2013 and will be completed in year 2014.
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Recipient
RAM Mutual Insurance
2011 Fiscal Year Funding Amount
$565
Fund Source
Public awareness; install new meter
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$156,977
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy (WRAPS) report to maintain and improve water quality for the St Louis River Watershed.

Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$99,951
Fund Source

The purpose of this project is to provide technical support to data generators and users of the Saint Louis River Area of Concern (SLRAOC) to support the Beneficial Use Impairment (BUI) removal process.

Recipient
Bay West Inc
2017 Fiscal Year Funding Amount
$44,831
Fund Source

This project is completing Feasibility Study Addendums and updating other project documents for Thomson and Scanlon Reservoirs, and Mud Lake W sites in the St. Louis River Area of Concern (AOC).

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$165,599
Fund Source

The St. Louis River watershed is one of the largest watersheds in northern Minnesota and the largest single contributing watershed to Lake Superior. Surface waters are abundant with 353 lakes and 97 streams segments. Large areas of forest and wetlands help to sustain areas of exceptional water quality. However, land use changes have degraded many lakes, rivers, and streams. 21 stream reaches have aquatic life impairments, as identified by high turbidity (1 reach), poor quality aquatic macro-invertebrate community (16 reaches), and/or poor quality fish community (12 reaches).

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$79,972
Fund Source

The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
Metropolitan Council/CDM Smith
2014 Fiscal Year Funding Amount
$54,694
2015 Fiscal Year Funding Amount
$42,006
Fund Source

The Metropolitan Council, in conjunction with CDM Smith and HKGi consultants, reorganized and expanded the water conservation tools on the water supply planning pages of the Metropolitan Council’s website. The revised toolbox was organized into an online, web-based guide format. These tools are supplemented with fact sheets and case studies that serve to educate and provide useful information to support water conservation programs and activities.

Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.