All Projects

Showing 1 - 40 of 49 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Recipient
Emmons and Oliver Resources, Inc.
2013 Fiscal Year Funding Amount
$22,012
Fund Source

The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.

Recipient
Western Hennepin County Pioneers Association
2015 Fiscal Year Funding Amount
$10,000
To hire a qualified professional to construct appropriate housing for a significant collections piece.
Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$35,246
2011 Fiscal Year Funding Amount
$31,754
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.

Recipient
Metropolitan Council/Short Elliott Hendrickson
2014 Fiscal Year Funding Amount
$145,003
2015 Fiscal Year Funding Amount
$193,803
Fund Source

The State Fiscal Year 2014-2015 Clean Water Fund appropriation identified the northeast metro as an area where potential solutions are needed to address emerging water supply issues. The Metropolitan Council, in conjunction with S.E.H. consultants, evaluated water supply approaches to serve the northeastern part of the Twin Cities metropolitan area. A subregional study areas was selected based on the indication of potential problems with the long-term sustainability of current water supplies, as well as expressed interest by community stakeholders.

Recipient
RESPEC
2011 Fiscal Year Funding Amount
$96,618
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.

Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$99,998
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.

Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$67,039
Fund Source

This project addresses six lakes that have aquatic recreation impairments and one creek reach that has a bacteria impairment for E. coli. The project will evaluate the water quality impairments, complete pollutant source assessments, and establish loading capacities and allocations for the impairments.

Recipient
Barr Engineering-Minneapolis
2016 Fiscal Year Funding Amount
$53,994
Fund Source

The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.

Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$110,824
Fund Source

This project will complete an EPA- and MPCA-approved TMDL Study and an MPCA-approved TMDL Implementation Plan that provide quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, that are understood and adoptable by local units of government and other stakeholders.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,730
Fund Source

Refinement of the Sediment Recution Strategy through incorporation of feedback gather during 30-day comment period.

Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$4,826
Fund Source

This project will support the review of all public comments submitted for the North Fork Crow River TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Recipient
Wenck Associates, Inc.
2014 Fiscal Year Funding Amount
$1,524
Fund Source
The goal of this project is to add dual endpoints to the turbidity section of the North Fork Crow TMDL so that it addresses the proposed TSS standards.
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Recipient
Wenck Associates, Inc.
2015 Fiscal Year Funding Amount
$21,434
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality stream impairments and maintain or improve water quality of streams throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and develop restoration and protection strategies for the streams in the Pioneer-Sarah Creek watershed.

Recipient
Wenck Associates Inc
2017 Fiscal Year Funding Amount
$8,471
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Recipient
Metropolitan Council/HDR
2014 Fiscal Year Funding Amount
$23,304
2015 Fiscal Year Funding Amount
$403,182
2016 Fiscal Year Funding Amount
$95,060
Fund Source

The Metropolitan Council, in conjunction with HDR Engineering, Inc. consultants, will evaluate a variety of approaches to develop sustainable water supplies across the metro area. Subregional study areas are being selected where multiple communities face potential problems with the long-term sustainability of current water supplies, and where community stakeholders have expressed interest in learning more about sustainable water supply options.

Recipient
Metropolitan Council/Barr Engineering Company
2015 Fiscal Year Funding Amount
$47,487
2016 Fiscal Year Funding Amount
$1,905
Fund Source

As the Metropolitan Council updated the Twin Cities Metropolitan Area Master Water Supply Plan, stakeholders asked the Council to consider the sustainable limits of the region’s water sources. The Council’s most important analytical tool is a regional groundwater flow model (Metro Model 3), which can be used to quantify the long-term regional impacts caused by hundreds of independent groundwater appropriations.

Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Recipient
Aero Systems Engineering
2013 Fiscal Year Funding Amount
$889
Fund Source
Seal existing well
Recipient
Bean's Greenwood Marina
2012 Fiscal Year Funding Amount
$6,553
Fund Source
Construct new well; seal existing well; new water lines
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$952
Fund Source

This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$24,940
Fund Source

This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.

Recipient
LimnoTech
2012 Fiscal Year Funding Amount
$3,810
2011 Fiscal Year Funding Amount
$46,430
Fund Source

This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.

Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Recipient
Metropolitan Council/Barr Engineering Company
2012 Fiscal Year Funding Amount
$20,789
2013 Fiscal Year Funding Amount
$135,416
2014 Fiscal Year Funding Amount
$66,495
2015 Fiscal Year Funding Amount
$5,662
Fund Source

State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.