All Projects

Showing 1 - 18 of 18 | Export projects
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$94,683
Fund Source

This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.

Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$35,246
2011 Fiscal Year Funding Amount
$31,754
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.

Recipient
Metropolitan Council/Short Elliott Hendrickson
2014 Fiscal Year Funding Amount
$145,003
2015 Fiscal Year Funding Amount
$193,803
Fund Source

The State Fiscal Year 2014-2015 Clean Water Fund appropriation identified the northeast metro as an area where potential solutions are needed to address emerging water supply issues. The Metropolitan Council, in conjunction with S.E.H. consultants, evaluated water supply approaches to serve the northeastern part of the Twin Cities metropolitan area. A subregional study areas was selected based on the indication of potential problems with the long-term sustainability of current water supplies, as well as expressed interest by community stakeholders.

Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$199,999
Fund Source
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Recipient
Limnotech
2011 Fiscal Year Funding Amount
$49,980
Fund Source

This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,730
Fund Source

Refinement of the Sediment Recution Strategy through incorporation of feedback gather during 30-day comment period.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Recipient
Isanti Estates
2014 Fiscal Year Funding Amount
$1,137
Fund Source
Well monitoring alarms; Well tank cleaning and filtering systems; Tank flow meter; Wellhead security cover and fencing; Antisiphon valve, backflow valves
Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$6,911
Fund Source

This project will provide modeling services to support the completion of the Typo Lake and Martin Lake Excess Nutrients TMDL report. A Total Maximum Daily Load (TMDL) report quantifies pollutant levels, identifies sources of pollution, and proposes ways to bring water quality back to an acceptable level.

Recipient
Metropolitan Council/Barr Engineering Company
2012 Fiscal Year Funding Amount
$20,789
2013 Fiscal Year Funding Amount
$135,416
2014 Fiscal Year Funding Amount
$66,495
2015 Fiscal Year Funding Amount
$5,662
Fund Source

State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.

Recipient
Metropolitan Council
2012 Fiscal Year Funding Amount
$16,549
2013 Fiscal Year Funding Amount
$73,308
Fund Source

Regional recharge modeling with the Twin Cities daily soil water balance (SWB) model has been a fundamental part of the Metropolitan Council’s groundwater flow modeling effort and supports the Metropolitan Area Master Water Supply Plan. The SWB model is used to evaluate the impact of planned and potential land use and climate on recharge in the eleven-county metropolitan area, and supports the ongoing update of the regional groundwater flow model.

Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$95,999
Fund Source

This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).

Recipient
Metropolitan Council/CDM Smith
2014 Fiscal Year Funding Amount
$54,694
2015 Fiscal Year Funding Amount
$42,006
Fund Source

The Metropolitan Council, in conjunction with CDM Smith and HKGi consultants, reorganized and expanded the water conservation tools on the water supply planning pages of the Metropolitan Council’s website. The revised toolbox was organized into an online, web-based guide format. These tools are supplemented with fact sheets and case studies that serve to educate and provide useful information to support water conservation programs and activities.