All Projects

Showing 1 - 37 of 37 | Export projects
Recipient
Peer Engineering
2012 Fiscal Year Funding Amount
$72,000
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Ramsey county and Hennepin county. This project will provide services and oversight of the installation for up to 16 well sites.

Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Recipient
Widseth Smtih Nolting
2014 Fiscal Year Funding Amount
$116,042
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Recipient
Widseth Smtih Nolting
2015 Fiscal Year Funding Amount
$74,429
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.

Recipient
Widseth Smith & Nolting
2012 Fiscal Year Funding Amount
$177,052
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in northcentral and northeastern Minnesota. This project will provide services and oversight of the installation for up to 31 well sites.

Recipient
AMEC Geomatrix
2010 Fiscal Year Funding Amount
$80,000
Fund Source

Installation of 35-40 monitoring wells in the 11 county metropolitan area.

Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Recipient
Emmons and Olivier Resources, Inc
2018 Fiscal Year Funding Amount
$17,448
Fund Source

Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.

Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$94,683
Fund Source

This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.

Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$36,342
Fund Source

This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.

Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$173,118
Fund Source

The goal of this project is to establish load reduction requirements for impaired waters and to develop restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.

Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Recipient
Limnotech
2011 Fiscal Year Funding Amount
$49,980
Fund Source

This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.

Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$77,128
Fund Source

The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.

Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Recipient
Barr Engineering-Duluth
2014 Fiscal Year Funding Amount
$52,984
Fund Source
The overall goal of this project is to further develop performance standards, design standards, or other tools to enable the implementation of low-impact development and other stormwater management techniques.
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$110,824
Fund Source

This project will complete an EPA- and MPCA-approved TMDL Study and an MPCA-approved TMDL Implementation Plan that provide quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, that are understood and adoptable by local units of government and other stakeholders.

Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$53,465
Fund Source

This project will define the major factors causing harm to fish and other river and stream life within the Nemadji watershed. Stressor identification is a formal and rigorous process to identify these factors, explain the linkages between the results of biological monitoring and water quality assessments, and organize this information into a structure of scientific evidence that supports the conclusions of the process. Stressor identification is a component of the Watershed Restoration and protection (WRAP) approach.

Recipient
Wenck Associates, Inc.
2015 Fiscal Year Funding Amount
$21,434
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality stream impairments and maintain or improve water quality of streams throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and develop restoration and protection strategies for the streams in the Pioneer-Sarah Creek watershed.

Recipient
Wenck Associates Inc
2017 Fiscal Year Funding Amount
$8,471
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$25,443
Fund Source

This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.

Recipient
SRF Consulting
2016 Fiscal Year Funding Amount
$4,589
Fund Source

This work will determine the feasibility of alternatives to monitor roadside swales.

Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$146,992
Fund Source

This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.

Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$133,904
Fund Source

This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.

Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$93,388
Fund Source

The goal of this project is to update and revise the Twin Cities Metro Area (TCMA) Chloride Management Plan to a Statewide Chloride Management Plan (CMP). The Statewide CMP will provide stakeholders the information and tools necessary to improve and/or maintain water quality with respect to chloride.

Recipient
CDM Smith Inc
2013 Fiscal Year Funding Amount
$249,270
Fund Source

The overall goal of this process is to compile the information developed by the MPCA into summaries, tables, graphics and tools that the MPCA can use to replace sections of the Stormwater Manual. CDM Smith has developed an approach and workplan that is aimed at complimenting the knowledge of the MPCA and assisting the MPCA through supplemental literature searches, compilation of materials into usable formats, and facilitation of discussions when needed.

Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$38,120
Fund Source

The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$69,956
Fund Source

The goal of this project is the development of an automated planning tool to complete the Twin Cities Metropolitan Area Chloride Watershed Watershed Restoration and Protection Strategy (WRAPS).

Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$47,612
Fund Source

The goal of this project is to maintain and make enhancements to the Winter Maintenance Assessment tool (WMAt), which is a necessary technical resource and planning tool for stakeholders and permittees to implement the chloride reduction strategies described in the Chloride Management Plan.